Research on Energy-saving Renovation Schemes for Existing Data Center Server Rooms

In order to meet the current requirements for green and high-quality development, it is necessary to carry out energy-saving renovation on the old existing data center computer room. In the China Mobile Information Port No. 1 Data Center Renovation Project, a comprehensive evaluation of the operating status of the computer room was carried out to address issues such as the long distance of the original precision air conditioning supply and the susceptibility to local hotspots. Computational Fluid Dynamics (CFD) simulation software 6SigmaRoom was used to simulate and study energy-saving renovation schemes. By analyzing the air flow organization and energy-saving effects of the air conditioning, the top mounted heat pipe air conditioning+enclosed cold channel scheme was selected to renovate the computer room. By simulating the power consumption within 144 hours after renovation, it was calculated that the PUE factor at the end of the air conditioning system decreased to 0.014, resulting in a power saving rate of approximately ${9 2 \%}$. The research results of this article can provide reference for energy-saving transformation in existing data center computer rooms.

Authors

Publication Details

Published
2024-09-20
DOI
https://doi.org/10.1109/epee63731.2024.10875187
Primary Topic
Cloud Computing and Resource Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Energy-saving Renovation Schemes for Existing Data Center Server Rooms

Jie Gu, K. X. Su, Zhe Wang, Jing Liu et al.
Cloud Computing and Resource Management
article

Research on Energy-saving Renovation Schemes for Existing Data Center Server Rooms

Jie Gu, K. X. Su, Zhe Wang, Jing Liu, J. Z. Bai, Wei Li
article en

Abstract

In order to meet the current requirements for green and high-quality development, it is necessary to carry out energy-saving renovation on the old existing data center computer room. In the China Mobile Information Port No. 1 Data Center Renovation Project, a comprehensive evaluation of the operating status of the computer room was carried out to address issues such as the long distance of the original precision air conditioning supply and the susceptibility to local hotspots. Computational Fluid Dynamics (CFD) simulation software 6SigmaRoom was used to simulate and study energy-saving renovation schemes. By analyzing the air flow organization and energy-saving effects of the air conditioning, the top mounted heat pipe air conditioning+enclosed cold channel scheme was selected to renovate the computer room. By simulating the power consumption within 144 hours after renovation, it was calculated that the PUE factor at the end of the air conditioning system decreased to 0.014, resulting in a power saving rate of approximately ${9 2 \%}$. The research results of this article can provide reference for energy-saving transformation in existing data center computer rooms.

Affordable and clean energy
Openalex Percentile: Top 56%
Cloud Computing and Resource Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on Energy-saving Renovation Schemes for Existing Data Center Server Rooms — Jie Gu, K. X. Su, et al. · (2024) | TGRS Research Map | TGRS