A graph-based iterative strategy for solving the all-line transmission switching problem

Abstract The transmission switching problem aims to determine the optimal network topology that minimizes the operating costs of a power system. This problem is typically formulated as a mixed-integer optimization model, which involves big-M constants that lead to weak relaxations and significant computational challenges, particularly when all lines are switchable. In this paper, we propose a twofold approach: first, using graph theory to derive tighter big-M values by solving a relaxed longest path problem; second, introducing an iterative algorithm that incorporates a heuristic version of the switching problem to efficiently generate low-cost feasible solutions, thereby accelerating the search for optimal solutions in the integer optimization solver. Numerical results on the 118-bus network across 100 demand scenarios demonstrate that the proposed methodology reduces the number of unsolved instances within 1 h by 57% and decreases the average computational time by 44% compared to conventional approaches in the literature.

Authors

Institutions

Publication Details

Journal
Top
Published
2026-11-07
DOI
https://doi.org/10.1007/s11750-026-00733-6
Citations
4
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
5.62

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A graph-based iterative strategy for solving the all-line transmission switching problem

Juan Miguel Morales, Salvador Pineda, Marina Aguilar-Moreno
4 citations
Top
Electric Power System Optimization
5.62
article

A graph-based iterative strategy for solving the all-line transmission switching problem

Juan Miguel Morales, Salvador Pineda, Marina Aguilar-Moreno
article en
4 citations

Abstract

Abstract The transmission switching problem aims to determine the optimal network topology that minimizes the operating costs of a power system. This problem is typically formulated as a mixed-integer optimization model, which involves big-M constants that lead to weak relaxations and significant computational challenges, particularly when all lines are switchable. In this paper, we propose a twofold approach: first, using graph theory to derive tighter big-M values by solving a relaxed longest path problem; second, introducing an iterative algorithm that incorporates a heuristic version of the switching problem to efficiently generate low-cost feasible solutions, thereby accelerating the search for optimal solutions in the integer optimization solver. Numerical results on the 118-bus network across 100 demand scenarios demonstrate that the proposed methodology reduces the number of unsolved instances within 1 h by 57% and decreases the average computational time by 44% compared to conventional approaches in the literature.

Top
Universidad de Málaga (ES)
Universidad de Málaga, Ministerio de Ciencia, Innovación y Universidades, Ministerio de Ciencia e Innovación, Junta de Andalucía, Smithsonian Conservation Biology Institute, Agencia de Innovación y Desarrollo de Andalucía, Agencia Estatal de Investigación
Industry, innovation and infrastructure, Affordable and clean energy
Openalex Percentile: Top 5%
Electric Power System Optimization
5.62
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon