Early warning algorithm for electric leakage risk in distribution field operations based on insulated pole-like work equipment

In power distribution field operations, the use of insulated pole-type work equipment can effectively reduce the risk of electric shock, but in some cases, there is still the possibility of electric leakage, which may pose a threat to the safety of the operators. In order to prevent electric leakage accidents, this paper proposes an early warning algorithm for electric leakage risk in power distribution field operations based on insulated pole-type work equipment. Features related to the risk of electric leakage are extracted, and the model is trained using historical data, and the model parameters are adjusted to optimize the performance. Sensors are installed at the site to monitor the insulation status and environmental conditions of insulated poles in real time, and the real-time monitoring data are input into the trained model to obtain the leakage risk score or probability output. The warning threshold is set according to the risk score and the actual situation. When the risk score output from the model exceeds the threshold, the system will automatically trigger an early warning to notify the on-site operators and management personnel, and the notification method includes SMS, sound or other appropriate methods. The experimental results show that the early warning algorithm can effectively predict and identify the risk of leakage of insulated pole-type work equipment in the distribution site operation, so that measures can be taken in advance to avoid accidents and protect the safety of the operating personnel. In addition, by using the insulated pole work method, the replacement of electric equipment and the repair of lines can be carried out without power supply, so as to improve the effectiveness of the use of electric equipment and lines, and to guarantee the stable and orderly power supply service of the electric power system.

Authors

Publication Details

Published
2024-09-20
DOI
https://doi.org/10.1109/epee63731.2024.10875410
Primary Topic
Electrical Fault Detection and Protection
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Early warning algorithm for electric leakage risk in distribution field operations based on insulated pole-like work equipment

Jiwen Cen, Tao Lin, Lili Yang, Guoliang Li et al.
Electrical Fault Detection and Protection
article

Early warning algorithm for electric leakage risk in distribution field operations based on insulated pole-like work equipment

Jiwen Cen, Tao Lin, Lili Yang, Guoliang Li, Zhiwei Xu
article en

Abstract

In power distribution field operations, the use of insulated pole-type work equipment can effectively reduce the risk of electric shock, but in some cases, there is still the possibility of electric leakage, which may pose a threat to the safety of the operators. In order to prevent electric leakage accidents, this paper proposes an early warning algorithm for electric leakage risk in power distribution field operations based on insulated pole-type work equipment. Features related to the risk of electric leakage are extracted, and the model is trained using historical data, and the model parameters are adjusted to optimize the performance. Sensors are installed at the site to monitor the insulation status and environmental conditions of insulated poles in real time, and the real-time monitoring data are input into the trained model to obtain the leakage risk score or probability output. The warning threshold is set according to the risk score and the actual situation. When the risk score output from the model exceeds the threshold, the system will automatically trigger an early warning to notify the on-site operators and management personnel, and the notification method includes SMS, sound or other appropriate methods. The experimental results show that the early warning algorithm can effectively predict and identify the risk of leakage of insulated pole-type work equipment in the distribution site operation, so that measures can be taken in advance to avoid accidents and protect the safety of the operating personnel. In addition, by using the insulated pole work method, the replacement of electric equipment and the repair of lines can be carried out without power supply, so as to improve the effectiveness of the use of electric equipment and lines, and to guarantee the stable and orderly power supply service of the electric power system.

Openalex Percentile: Top 75%
Electrical Fault Detection and Protection
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Early warning algorithm for electric leakage risk in distribution field operations based on insulated pole-like work equipment — Jiwen Cen, Tao Lin, et al. · (2024) | TGRS Research Map | TGRS