ANALISIS BEBAN KERJA DALAM PENENTUAN KEBUTUHAN PEKERJA YANG OPTIMAL DENGAN MENGGUNAKAN METODE FTE DAN WLA (Studi kasus: PT. Kunango Jantan)

Human resources are part of company assets that need to be managed well because they have a big influence on company performance. Tower division PT. Kunango Jantan is a business group engaged in the manufacture and strengthening of towers. Workers in the tower division are currently not fully structured well because there are still workers who have more than one position, which makes the workload felt by workers high and can disrupt worker productivity. So research is needed to idetermine the workloadi received by each worker using the Full Time iEquivalent (FTE) and Workload Analysis (WLA) methods. In this research, using the FTE method, it was found that there wasi an imbalance in the workload of each tower division worker in the overload category. For this reason, the company makes improvements by paying more attention to the capabilities and work facilities of each worker and can add additional workers. Using the WLA method, the optimal number of workers is 28 out of the actual 13 workers in the tower division.

Authors

Institutions

Publication Details

Journal
SPECTA Journal of Technology
Published
2024-09-30
DOI
https://doi.org/10.35718/specta.v8i2.1117
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS BEBAN KERJA DALAM PENENTUAN KEBUTUHAN PEKERJA YANG OPTIMAL DENGAN MENGGUNAKAN METODE FTE DAN WLA (Studi kasus: PT. Kunango Jantan)

Muhammad Nur, Zurids Adilla Frenita
SPECTA Journal of Technology
Management and Optimization Techniques
article

ANALISIS BEBAN KERJA DALAM PENENTUAN KEBUTUHAN PEKERJA YANG OPTIMAL DENGAN MENGGUNAKAN METODE FTE DAN WLA (Studi kasus: PT. Kunango Jantan)

Muhammad Nur, Zurids Adilla Frenita
article en

Abstract

Human resources are part of company assets that need to be managed well because they have a big influence on company performance. Tower division PT. Kunango Jantan is a business group engaged in the manufacture and strengthening of towers. Workers in the tower division are currently not fully structured well because there are still workers who have more than one position, which makes the workload felt by workers high and can disrupt worker productivity. So research is needed to idetermine the workloadi received by each worker using the Full Time iEquivalent (FTE) and Workload Analysis (WLA) methods. In this research, using the FTE method, it was found that there wasi an imbalance in the workload of each tower division worker in the overload category. For this reason, the company makes improvements by paying more attention to the capabilities and work facilities of each worker and can add additional workers. Using the WLA method, the optimal number of workers is 28 out of the actual 13 workers in the tower division.

SPECTA Journal of TechnologyVol. 8(2)
Universitas Islam Negeri Sultan Syarif Kasim Riau (ID)
Openalex Percentile: Top 53%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

ANALISIS BEBAN KERJA DALAM PENENTUAN KEBUTUHAN PEKERJA YANG OPTIMAL DENGAN MENGGUNAKAN METODE FTE DAN WLA (Studi kasus: PT. Kunango Jantan) — Muhammad Nur, Zurids Adilla Frenita · SPECTA Journal of Technology (2024) | TGRS Research Map | TGRS