Predicting and controlling ground vibrations from blasting is crucial for protecting structures and minimizing environmental impacts. This study investigates how explosive quantity and scaled distances affect peak particle velocity and establishes empirical equations to estimate this velocity at different distances from the blast area. The study found that the maximum charge per delay at a peak particle velocity of 10 mm/s was reduced to 13.46% as the delay timing was increased from 0 to 25 ms and 9.99% from 0 to 50 ms delay timing. The reduction of maximum charge with increasing delay timing leads to the reduction of ground vibration. The developed model is validated with statistical analysis and field data, offering practical tools for optimizing blast designs to reduce ground vibrations. Blast monitoring data showed that over 98% of events had frequencies above 8 Hz, leading the study to use peak particle velocity thresholds of 10 mm/s and 15 mm/s. The statistical analysis showed a strong correlation between predicted and observed peak particle velocity for delay durations. The coefficient of determination was 0.83, 0.89, and 0.90 for 0, 25 ms, and 50 ms delay timings, respectively, underscoring the precision and reliability of the predictive models.

Authors

Publication Details

Journal
Journal of Sustainable Mining
Published
2025-02-15
DOI
https://doi.org/10.46873/2300-3960.1452
Citations
1
Primary Topic
Geomechanics and Mining Engineering
Type
article
Field-Weighted Citation Impact
0.86
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prediction and control of ground vibrations due to blasting activities in aggregate mines

Bhanwar Singh Choudhary, Geleta Warkisa Deressa, Iddi Ramadhani Bulushi
1 citations
Journal of Sustainable Mining
Geomechanics and Mining Engineering
0.86
article

Prediction and control of ground vibrations due to blasting activities in aggregate mines

Bhanwar Singh Choudhary, Geleta Warkisa Deressa, Iddi Ramadhani Bulushi
article en
1 citations

Abstract

Predicting and controlling ground vibrations from blasting is crucial for protecting structures and minimizing environmental impacts. This study investigates how explosive quantity and scaled distances affect peak particle velocity and establishes empirical equations to estimate this velocity at different distances from the blast area. The study found that the maximum charge per delay at a peak particle velocity of 10 mm/s was reduced to 13.46% as the delay timing was increased from 0 to 25 ms and 9.99% from 0 to 50 ms delay timing. The reduction of maximum charge with increasing delay timing leads to the reduction of ground vibration. The developed model is validated with statistical analysis and field data, offering practical tools for optimizing blast designs to reduce ground vibrations. Blast monitoring data showed that over 98% of events had frequencies above 8 Hz, leading the study to use peak particle velocity thresholds of 10 mm/s and 15 mm/s. The statistical analysis showed a strong correlation between predicted and observed peak particle velocity for delay durations. The coefficient of determination was 0.83, 0.89, and 0.90 for 0, 25 ms, and 50 ms delay timings, respectively, underscoring the precision and reliability of the predictive models.

Journal of Sustainable MiningVol. 24(2)
Climate action
Openalex Percentile: Top 34%
Geomechanics and Mining Engineering
0.86
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Prediction and control of ground vibrations due to blasting activities in aggregate mines — Bhanwar Singh Choudhary, Geleta Warkisa Deressa, et al. · Journal of Sustainable Mining (2025) | TGRS Research Map | TGRS