Critical path method utilization for optimal scheduling of production activities

Critical Path Method (CPM) is a useful method for scheduling activities involved in a project. CPM is suitable for large and complex projects in which many tasks are involved and the interrelationships among these tasks must be taken into account. Its efficacy can easily be transferred to the optimal scheduling of production engineering activities in order to save time involved in the project. It helps in identifying the sequence of jobs that determines the earliest possible completion date for the project. The knowledge of the critical jobs can aid in eliminating the fairly common and costly practice of rushing all jobs to reduce the total project time. Meanwhile, rushing only the critical jobs will have the desired effect of decreasing the total project time. In this study, the critical path method was utilized in scheduling activities involved in the production of a new product by a metalworks manufacturing company. The project activities involved making an initial market study which took 25 days, developing promotional ideas which took 22 days, estimating promotional costs which took 16 days, conducting initial pricing study which took 29 days, preparing a detailed design which took 30 days, manufacturing prototypes which took 14 days, making design changes which took 12 days and determination of the final selling price of the product which took 15 days. The critical path analysis revealed that the minimum allowable time and earliest possible completion date for the project is 96 days. This research provides a procedure for implementing the Critical Path Method for production activities scheduling.

Authors

Publication Details

Journal
Future Sustainability
Published
2024-08-15
DOI
https://doi.org/10.55670/fpll.fusus.2.3.1
Citations
1
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Critical path method utilization for optimal scheduling of production activities

Ovundah King Wofuru-Nyenke
1 citations
Future Sustainability
Scheduling and Optimization Algorithms
0.35
article

Critical path method utilization for optimal scheduling of production activities

Ovundah King Wofuru-Nyenke
article en
1 citations

Abstract

Critical Path Method (CPM) is a useful method for scheduling activities involved in a project. CPM is suitable for large and complex projects in which many tasks are involved and the interrelationships among these tasks must be taken into account. Its efficacy can easily be transferred to the optimal scheduling of production engineering activities in order to save time involved in the project. It helps in identifying the sequence of jobs that determines the earliest possible completion date for the project. The knowledge of the critical jobs can aid in eliminating the fairly common and costly practice of rushing all jobs to reduce the total project time. Meanwhile, rushing only the critical jobs will have the desired effect of decreasing the total project time. In this study, the critical path method was utilized in scheduling activities involved in the production of a new product by a metalworks manufacturing company. The project activities involved making an initial market study which took 25 days, developing promotional ideas which took 22 days, estimating promotional costs which took 16 days, conducting initial pricing study which took 29 days, preparing a detailed design which took 30 days, manufacturing prototypes which took 14 days, making design changes which took 12 days and determination of the final selling price of the product which took 15 days. The critical path analysis revealed that the minimum allowable time and earliest possible completion date for the project is 96 days. This research provides a procedure for implementing the Critical Path Method for production activities scheduling.

Future SustainabilityVol. 2(3)
Openalex Percentile: Top 31%
Scheduling and Optimization Algorithms
0.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Critical path method utilization for optimal scheduling of production activities — Ovundah King Wofuru-Nyenke · Future Sustainability (2024) | TGRS Research Map | TGRS