Essential components for implementing care coordination and discharge procedures

Children’s Mercy Hospital (CMH), a 390-bed free-standing paediatric hospital in Kansas City, Missouri, implemented a formalised patient progression programme in 2022 to enhance patient throughput from pre-arrival to discharge. Utilising Lean process improvement methodologies, CMH identified 88 projects aimed at improving patient progression. In May 2023, CMH opened a patient progression hub, centralising key teams and integrating advanced technology to monitor and manage patient flow. A significant emphasis was placed on discharge and care coordination, with the mission of ensuring safe and timely discharges. Important initiatives included hiring a discharge expediter (DE) to address discharge barriers and implementing projected discharge date (PDD) and clinical readiness date (CRD) to improve discharge transparency and preparation. The patient progression hub features technology from GE Healthcare, with 16 screens continuously displaying pertinent throughput information such as organisational capacity, emergency department (ED) capacity, planned and confirmed discharges, and patients needing transfer from the intensive care unit (ICU) to the medical/surgical units. This real-time data sharing has been crucial in coordinating care and expediting discharges to address system bottlenecks. Additionally, CMH introduced ‘lightning rounds’, which are quick multidisciplinary huddles to review discharge needs. Afternoon rounds were implemented to facilitate continuous communication between charge nurses and care managers. These efforts, supported by innovative technology, have led to substantial improvements in patient outcomes. Timely, well-coordinated discharges have reduced hospital stay durations, minimised readmission rates and enhanced overall patient satisfaction. The initiatives have also resulted in improved capacity management, allowing CMH to better serve its patient population and ensure high-quality, patient-centred care.

Authors

Institutions

Publication Details

Journal
Management in healthcare.
Published
2025-02-13
DOI
https://doi.org/10.69554/nsdm6033
Primary Topic
Healthcare Systems and Practices
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Essential components for implementing care coordination and discharge procedures

Sherry McCool, Barbara J. Bolt, Ashley Daly, Jodie Winfrey
Management in healthcare.
Healthcare Systems and Practices
article

Essential components for implementing care coordination and discharge procedures

Sherry McCool, Barbara J. Bolt, Ashley Daly, Jodie Winfrey
article en

Abstract

Children’s Mercy Hospital (CMH), a 390-bed free-standing paediatric hospital in Kansas City, Missouri, implemented a formalised patient progression programme in 2022 to enhance patient throughput from pre-arrival to discharge. Utilising Lean process improvement methodologies, CMH identified 88 projects aimed at improving patient progression. In May 2023, CMH opened a patient progression hub, centralising key teams and integrating advanced technology to monitor and manage patient flow. A significant emphasis was placed on discharge and care coordination, with the mission of ensuring safe and timely discharges. Important initiatives included hiring a discharge expediter (DE) to address discharge barriers and implementing projected discharge date (PDD) and clinical readiness date (CRD) to improve discharge transparency and preparation. The patient progression hub features technology from GE Healthcare, with 16 screens continuously displaying pertinent throughput information such as organisational capacity, emergency department (ED) capacity, planned and confirmed discharges, and patients needing transfer from the intensive care unit (ICU) to the medical/surgical units. This real-time data sharing has been crucial in coordinating care and expediting discharges to address system bottlenecks. Additionally, CMH introduced ‘lightning rounds’, which are quick multidisciplinary huddles to review discharge needs. Afternoon rounds were implemented to facilitate continuous communication between charge nurses and care managers. These efforts, supported by innovative technology, have led to substantial improvements in patient outcomes. Timely, well-coordinated discharges have reduced hospital stay durations, minimised readmission rates and enhanced overall patient satisfaction. The initiatives have also resulted in improved capacity management, allowing CMH to better serve its patient population and ensure high-quality, patient-centred care.

Management in healthcare.Vol. 9(3)
Children's Mercy Hospital (US)
Openalex Percentile: Top 95%
Healthcare Systems and Practices
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Essential components for implementing care coordination and discharge procedures — Sherry McCool, Barbara J. Bolt, et al. · Management in healthcare. (2025) | TGRS Research Map | TGRS