Improving the Performance Prediction of Process Simulation Models for TBM Tunneling Using Real-Time Project Data

The planning of production, logistics, and maintenance in mechanized tunneling relies on project-specific conditions and assumptions about numerous production parameters. Analyzing multiple scenarios for TBM production is crucial for ensuring robust project flow. Process simulation models are valuable for this analysis. However, deviations from the plan often occur due to uncertainties in initial assumptions and unforeseen events during construction, especially given the variable ground conditions in TBM tunneling. This paper presents a concept for adapting offline simulation models used in the planning phase for real-time optimization by integrating actual project data. Continuously updating these models with new data from the construction site improves performance predictions. The concept involves integrating current construction progress into the simulation model and updating the originally assumed input data with project-specific actual data. An example study demonstrates the continuous adjustment of a simulation model and its impact on project duration prognosis. The enhancement of the prognosis by integrating real-time data is investigated, and an initial assessment of the earliest possible time for an update is made. The benefits of using real-time data in process simulation during construction are discussed, highlighting the improved accuracy in performance prediction and the potential for more efficient project management.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-02-13
DOI
https://doi.org/10.3390/app15041969
Citations
3
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
2.86

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Improving the Performance Prediction of Process Simulation Models for TBM Tunneling Using Real-Time Project Data

Annika Jodehl, Markus König, Markus Thewes, Judith Berns
3 citations
Applied Sciences
Tunneling and Rock Mechanics
2.86
article

Improving the Performance Prediction of Process Simulation Models for TBM Tunneling Using Real-Time Project Data

Annika Jodehl, Markus König, Markus Thewes, Judith Berns
article en
3 citations

Abstract

The planning of production, logistics, and maintenance in mechanized tunneling relies on project-specific conditions and assumptions about numerous production parameters. Analyzing multiple scenarios for TBM production is crucial for ensuring robust project flow. Process simulation models are valuable for this analysis. However, deviations from the plan often occur due to uncertainties in initial assumptions and unforeseen events during construction, especially given the variable ground conditions in TBM tunneling. This paper presents a concept for adapting offline simulation models used in the planning phase for real-time optimization by integrating actual project data. Continuously updating these models with new data from the construction site improves performance predictions. The concept involves integrating current construction progress into the simulation model and updating the originally assumed input data with project-specific actual data. An example study demonstrates the continuous adjustment of a simulation model and its impact on project duration prognosis. The enhancement of the prognosis by integrating real-time data is investigated, and an initial assessment of the earliest possible time for an update is made. The benefits of using real-time data in process simulation during construction are discussed, highlighting the improved accuracy in performance prediction and the potential for more efficient project management.

Applied SciencesVol. 15(4)
Ruhr University Bochum (DE)
Deutsche Forschungsgemeinschaft
Openalex Percentile: Top 12%
Tunneling and Rock Mechanics
2.86
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Improving the Performance Prediction of Process Simulation Models for TBM Tunneling Using Real-Time Project Data — Annika Jodehl, Markus König, et al. · Applied Sciences (2025) | TGRS Research Map | TGRS