On the contribution of planned and unplanned build interrupts to the fatigue properties of Ti6Al4V from laser powder bed fusion

Abstract Additive manufacturing (AM) by Laser Powder Bed Fusion (L-PBF) offers several advantages over traditional methods in the manufacture of metal components. One concern in L-PBF is that interruptions to the build cycle could introduce defects within the component. Although the builds can often be resumed due to the layer-wise nature of the L-PBF process, the potential for defects and their contribution to component reliability are problematic and often require rigorous post-build inspections. The objective of this study was to characterize the metal obtained from builds of Ti6Al4V with interruptions and assess the fatigue behavior. The build interruptions included a planned pause and unplanned interrupt that resulted from recoater blade contact with the build. Results showed that there was no contribution from the build pause on the quality of metal or its fatigue properties. However, specimens that contained an unplanned interrupt exhibited a decrease in fatigue life compared to the control (i.e., without interrupt). Fractography revealed large (d > 200 μm) lack of fusion (LOF) defects near the unplanned interrupt that served as the failure origin in fatigue, but they were not identified in X-ray micro computed tomography (μCT) analysis. Numerous LOF defects developed at the unplanned interrupt layer line, which appears attributed to disruption of the powder layer and the preparations necessary for resuming the build cycle. Overall, results showed that unplanned build interrupts can reduce the fatigue strength of components produced by L-PBF and that post-build inspection by μCT may not be capable of identifying the detrimental defects produced.

Authors

Institutions

Publication Details

Journal
Journal of Materials Research and Technology
Published
2025-02-13
DOI
https://doi.org/10.1016/j.jmrt.2025.02.121
Citations
2
Primary Topic
Additive Manufacturing Materials and Processes
Type
article
Field-Weighted Citation Impact
1.43
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

On the contribution of planned and unplanned build interrupts to the fatigue properties of Ti6Al4V from laser powder bed fusion

Rick Schleusener, Conor Cunningham, M. Ramulu, A. Montelione et al.
2 citations
Journal of Materials Research and Technology
Additive Manufacturing Materials and Processes
1.43
article

On the contribution of planned and unplanned build interrupts to the fatigue properties of Ti6Al4V from laser powder bed fusion

Rick Schleusener, Conor Cunningham, M. Ramulu, A. Montelione, Dwayne Arola, R. Schur
article en
2 citations

Abstract

Abstract Additive manufacturing (AM) by Laser Powder Bed Fusion (L-PBF) offers several advantages over traditional methods in the manufacture of metal components. One concern in L-PBF is that interruptions to the build cycle could introduce defects within the component. Although the builds can often be resumed due to the layer-wise nature of the L-PBF process, the potential for defects and their contribution to component reliability are problematic and often require rigorous post-build inspections. The objective of this study was to characterize the metal obtained from builds of Ti6Al4V with interruptions and assess the fatigue behavior. The build interruptions included a planned pause and unplanned interrupt that resulted from recoater blade contact with the build. Results showed that there was no contribution from the build pause on the quality of metal or its fatigue properties. However, specimens that contained an unplanned interrupt exhibited a decrease in fatigue life compared to the control (i.e., without interrupt). Fractography revealed large (d > 200 μm) lack of fusion (LOF) defects near the unplanned interrupt that served as the failure origin in fatigue, but they were not identified in X-ray micro computed tomography (μCT) analysis. Numerous LOF defects developed at the unplanned interrupt layer line, which appears attributed to disruption of the powder layer and the preparations necessary for resuming the build cycle. Overall, results showed that unplanned build interrupts can reduce the fatigue strength of components produced by L-PBF and that post-build inspection by μCT may not be capable of identifying the detrimental defects produced.

Journal of Materials Research and TechnologyVol. 35
University of Washington (US), Boeing (Australia) (AU)
Sustainable cities and communities
Openalex Percentile: Top 22%
Additive Manufacturing Materials and Processes
1.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.