Research on the Time Series Prediction of Acoustic Emission Parameters Based on the Factor Analysis–Particle Swarm Optimization Back Propagation Model

Early warning for rock blasting is crucial for ensuring the safety of deep underground engineering. Existing methods primarily focus on classifying rock blasting levels, which makes it difficult to provide timely warnings. This paper proposes a novel early warning framework for rock blasting based on time series prediction of acoustic emission (AE) parameters. Based on uniaxial rock tests, ten AE parameters (rise time, ring count, energy, duration, amplitude, average frequency, RMS voltage, average signal level, peak frequency, and initial frequency) are identified as potential indicators for rock blasting early warning. These ten parameters collectively affect the accuracy of AE monitoring. Factor analysis is employed to process the normalized AE data, simplifying the data structure and identifying common variables. Additionally, it is found that the BP neural network optimized by Particle Swarm Optimization (PSO) is more suitable for predicting the future evolution of these AE parameters. This makes it possible to establish a comprehensive multi-indicator early warning system. The proposed framework provides a new perspective for rock blasting early warning systems.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-02-13
DOI
https://doi.org/10.3390/app15041977
Citations
2
Primary Topic
Evaluation Methods in Various Fields
Type
article
Field-Weighted Citation Impact
3.68
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Time Series Prediction of Acoustic Emission Parameters Based on the Factor Analysis–Particle Swarm Optimization Back Propagation Model

Meng Wang, Xuebin Xie
2 citations
Applied Sciences
Evaluation Methods in Various Fields
3.68
article

Research on the Time Series Prediction of Acoustic Emission Parameters Based on the Factor Analysis–Particle Swarm Optimization Back Propagation Model

Meng Wang, Xuebin Xie
article en
2 citations

Abstract

Early warning for rock blasting is crucial for ensuring the safety of deep underground engineering. Existing methods primarily focus on classifying rock blasting levels, which makes it difficult to provide timely warnings. This paper proposes a novel early warning framework for rock blasting based on time series prediction of acoustic emission (AE) parameters. Based on uniaxial rock tests, ten AE parameters (rise time, ring count, energy, duration, amplitude, average frequency, RMS voltage, average signal level, peak frequency, and initial frequency) are identified as potential indicators for rock blasting early warning. These ten parameters collectively affect the accuracy of AE monitoring. Factor analysis is employed to process the normalized AE data, simplifying the data structure and identifying common variables. Additionally, it is found that the BP neural network optimized by Particle Swarm Optimization (PSO) is more suitable for predicting the future evolution of these AE parameters. This makes it possible to establish a comprehensive multi-indicator early warning system. The proposed framework provides a new perspective for rock blasting early warning systems.

Applied SciencesVol. 15(4)
Central South University (CN)
Openalex Percentile: Top 9%
Evaluation Methods in Various Fields
3.68
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.