A Material Estimation Method for Out-Building Survey of Low-Voltage Distribution Network Industry Expansion Based on GIS

For the out-building survey of low-voltage distribution network industry expansion, a material estimation method based on GIS was proposed. Traditional methods rely on manual visual assessment, resulting in low efficiency and inaccurate estimation. The new method records the trajectory coordinates by GIS equipment and clean the data, removing duplicate and noisy data to ensure data reliability. Then, the centroid algorithm is used to select key points from the filtered trajectory information, connecting these points in time order to obtain the optimized wiring path. Finally, based on the total length of the wiring, the required materials, including the number of electric poles, insulation devices, and cables, are calculated to achieve more precise resource allocation and cost control. Experimental comparisons show that the new method planned the wiring path with shorter length and less material demand, proving its advantage in improving efficiency and reducing costs.

Authors

Institutions

Publication Details

Published
2024-09-20
DOI
https://doi.org/10.1109/icwapr63074.2024.10870503
Primary Topic
Technology and Security Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Material Estimation Method for Out-Building Survey of Low-Voltage Distribution Network Industry Expansion Based on GIS

Qi‐Fan Yang, Xiangang Peng, Fangyuan Xu, Xiaowen Chen et al.
Technology and Security Systems
article

A Material Estimation Method for Out-Building Survey of Low-Voltage Distribution Network Industry Expansion Based on GIS

Qi‐Fan Yang, Xiangang Peng, Fangyuan Xu, Xiaowen Chen, Lin Hao, Fengrui Chang, Peixiang Lin
article en

Abstract

For the out-building survey of low-voltage distribution network industry expansion, a material estimation method based on GIS was proposed. Traditional methods rely on manual visual assessment, resulting in low efficiency and inaccurate estimation. The new method records the trajectory coordinates by GIS equipment and clean the data, removing duplicate and noisy data to ensure data reliability. Then, the centroid algorithm is used to select key points from the filtered trajectory information, connecting these points in time order to obtain the optimized wiring path. Finally, based on the total length of the wiring, the required materials, including the number of electric poles, insulation devices, and cables, are calculated to achieve more precise resource allocation and cost control. Experimental comparisons show that the new method planned the wiring path with shorter length and less material demand, proving its advantage in improving efficiency and reducing costs.

Guangdong University of Technology (CN), China Southern Power Grid (China) (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 57%
Technology and Security Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Material Estimation Method for Out-Building Survey of Low-Voltage Distribution Network Industry Expansion Based on GIS — Qi‐Fan Yang, Xiangang Peng, et al. · (2024) | TGRS Research Map | TGRS