Multi-Dimensional Conflict Graph-Based Scheduling for Varied Deadline Requirements in IWSNs

Satisfying the end-to-end delay requirements of various real-time data flows is a critical challenge in industrial wireless sensor networks (IWSNs). Since each data flow has different deadline constraints, effectively utilizing network resources while ensuring that data flows meet their deadlines becomes an important problem to be addressed. This paper proposes a joint time slot and channel allocation algorithm based on a multi-dimensional conflict graph, aiming to minimize the total end-to-end delay of multiple data flows with different deadline constraints. First, the concept of a minimum integer scheduling unit (MISU) is introduced to represent the minimum transmission period based on the deadlines, allowing for a unified scheduling structure. Next, a flow-link-slot-channel tuple is proposed to describe potential scheduling schemes, and a multi-dimensional conflict graph (MDCG) is constructed based on the conflicts among tuples. The joint scheduling problem is then transformed into finding the optimal maximum independent set (MIS) in the MDCG. To reduce computational complexity, the original problem is decomposed into a series of maximum weight independent set (MWIS) subproblems using a greedy-based hop-wise scheduling algorithm. Simulation results demonstrate the effectiveness of the proposed algorithm in minimizing end-to-end delay compared to existing algorithms.

Authors

Institutions

Publication Details

Published
2024-11-01
DOI
https://doi.org/10.1109/cac63892.2024.10864943
Primary Topic
IoT and Edge/Fog Computing
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Dimensional Conflict Graph-Based Scheduling for Varied Deadline Requirements in IWSNs

Jinfeng Liao, Changjie Dong, Chenggen Pu, Han Cai et al.
IoT and Edge/Fog Computing
article

Multi-Dimensional Conflict Graph-Based Scheduling for Varied Deadline Requirements in IWSNs

Jinfeng Liao, Changjie Dong, Chenggen Pu, Han Cai, Ping Wang
article en

Abstract

Satisfying the end-to-end delay requirements of various real-time data flows is a critical challenge in industrial wireless sensor networks (IWSNs). Since each data flow has different deadline constraints, effectively utilizing network resources while ensuring that data flows meet their deadlines becomes an important problem to be addressed. This paper proposes a joint time slot and channel allocation algorithm based on a multi-dimensional conflict graph, aiming to minimize the total end-to-end delay of multiple data flows with different deadline constraints. First, the concept of a minimum integer scheduling unit (MISU) is introduced to represent the minimum transmission period based on the deadlines, allowing for a unified scheduling structure. Next, a flow-link-slot-channel tuple is proposed to describe potential scheduling schemes, and a multi-dimensional conflict graph (MDCG) is constructed based on the conflicts among tuples. The joint scheduling problem is then transformed into finding the optimal maximum independent set (MIS) in the MDCG. To reduce computational complexity, the original problem is decomposed into a series of maximum weight independent set (MWIS) subproblems using a greedy-based hop-wise scheduling algorithm. Simulation results demonstrate the effectiveness of the proposed algorithm in minimizing end-to-end delay compared to existing algorithms.

Chongqing University of Posts and Telecommunications (CN)
National Key Research and Development Program of China
Openalex Percentile: Top 68%
IoT and Edge/Fog Computing
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Multi-Dimensional Conflict Graph-Based Scheduling for Varied Deadline Requirements in IWSNs — Jinfeng Liao, Changjie Dong, et al. · (2024) | TGRS Research Map | TGRS