Optimization Scheduling of Virtual Power Plants with Electric Vehicles Based on Moth-Flame Optimization Algorithm

In recent years, distributed renewable energy generation has been vigorously developed to address energy crises, environmental pollution, and other issues. However, distributed renewable energy generation exhibits strong randomness and volatility. This paper constructs a dual-layer optimization scheduling model for virtual power plants (VPP) with electric vehicles (EVs), designs operational strategies for VPP integrating EV, and optimizes the output of each component using the moth-flame optimization algorithm. The moth-flame optimization algorithm demonstrates excellent search performance and robustness, suitable for solving complex real-world engineering problems. Simulation results indicate that coordinating output between EVs and controllable power sources can compensate for deviations in renewable energy output, reduce the grid impact caused by standalone EV grid integration, and enhance the supply reliability of virtual power plants.

Authors

Institutions

Publication Details

Published
2024-11-01
DOI
https://doi.org/10.1109/cac63892.2024.10865359
Primary Topic
Electric and Hybrid Vehicle Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization Scheduling of Virtual Power Plants with Electric Vehicles Based on Moth-Flame Optimization Algorithm

Jiachuan Shi, Jianyu Zhou, Hao Liu, Lianheng Zhang et al.
Electric and Hybrid Vehicle Technologies
article

Optimization Scheduling of Virtual Power Plants with Electric Vehicles Based on Moth-Flame Optimization Algorithm

Jiachuan Shi, Jianyu Zhou, Hao Liu, Lianheng Zhang, Sining Hu
article en

Abstract

In recent years, distributed renewable energy generation has been vigorously developed to address energy crises, environmental pollution, and other issues. However, distributed renewable energy generation exhibits strong randomness and volatility. This paper constructs a dual-layer optimization scheduling model for virtual power plants (VPP) with electric vehicles (EVs), designs operational strategies for VPP integrating EV, and optimizes the output of each component using the moth-flame optimization algorithm. The moth-flame optimization algorithm demonstrates excellent search performance and robustness, suitable for solving complex real-world engineering problems. Simulation results indicate that coordinating output between EVs and controllable power sources can compensate for deviations in renewable energy output, reduce the grid impact caused by standalone EV grid integration, and enhance the supply reliability of virtual power plants.

Shandong Jianzhu University (CN)
Affordable and clean energy
Openalex Percentile: Top 70%
Electric and Hybrid Vehicle Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization Scheduling of Virtual Power Plants with Electric Vehicles Based on Moth-Flame Optimization Algorithm — Jiachuan Shi, Jianyu Zhou, et al. · (2024) | TGRS Research Map | TGRS