Analysis of Technical Standards for Current Collection Performance Verification in Underground Sections

As the construction of underground railways for 180 km/h-class metropolitan express trains increases in Korea, ensuring stable current collection performance in tunnels becomes essential. In tunnel sections, the reduced separation between the pantograph and the overhead contact line (OCL) increases the risk of arc occurrences and affects pantograph dynamics. This study analyzes technical standards for verifying current collection performance between the pantograph and the OCL in underground sections at speeds up to 180 km/h. It was found that conventional video monitoring at 30 fps cannot detect arcs of 5 ms duration at 170 km/h because the train moves about 47 mm during a 1 ms exposure. Detecting such arcs requires a camera with 400 fps or higher. Additionally, with a camera resolution of 1936 × 1216 pixels and a viewing area of 1200 × 800 mm, the minimum detectable defect size is approximately 0.62 mm horizontally and 0.66 mm vertically. The proposed methods improve current collection performance verification, contributing to safer and more efficient underground railway operations.

Authors

Publication Details

Journal
The Transactions of The Korean Institute of Electrical Engineers
Published
2024-12-31
DOI
https://doi.org/10.5370/kiee.2024.73.12.2422
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Technical Standards for Current Collection Performance Verification in Underground Sections

Chulmin Park, Sang-Hoon Oh, Young Joo Park, Seong-Cheol Kim
The Transactions of The Korean Institute of Electrical Engineers
Underground infrastructure and sustainability
article

Analysis of Technical Standards for Current Collection Performance Verification in Underground Sections

Chulmin Park, Sang-Hoon Oh, Young Joo Park, Seong-Cheol Kim
article en

Abstract

As the construction of underground railways for 180 km/h-class metropolitan express trains increases in Korea, ensuring stable current collection performance in tunnels becomes essential. In tunnel sections, the reduced separation between the pantograph and the overhead contact line (OCL) increases the risk of arc occurrences and affects pantograph dynamics. This study analyzes technical standards for verifying current collection performance between the pantograph and the OCL in underground sections at speeds up to 180 km/h. It was found that conventional video monitoring at 30 fps cannot detect arcs of 5 ms duration at 170 km/h because the train moves about 47 mm during a 1 ms exposure. Detecting such arcs requires a camera with 400 fps or higher. Additionally, with a camera resolution of 1936 × 1216 pixels and a viewing area of 1200 × 800 mm, the minimum detectable defect size is approximately 0.62 mm horizontally and 0.66 mm vertically. The proposed methods improve current collection performance verification, contributing to safer and more efficient underground railway operations.

The Transactions of The Korean Institute of Electrical EngineersVol. 73(12)
Openalex Percentile: Top 71%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Technical Standards for Current Collection Performance Verification in Underground Sections — Chulmin Park, Sang-Hoon Oh, et al. · The Transactions of The Korean Institute of Electrical Engineers (2024) | TGRS Research Map | TGRS