Multi-Objective Optimization Method for Crane Scheduling in Steelmaking Workshop

In the steelmaking workshop, crane scheduling is a crucial logistics challenge affecting production efficiency and resource utilization. This study addresses the multi-machine, multi-task crane scheduling problem in steelmaking workshops by examining the associated temporal and spatial constraints. A multi-objective optimization model is formulated with the goals of minimizing total transport distance, passive transport distance, and waiting time. The model includes rules for resolving crane conflicts and employs the NSGA-II algorithm to identify the Pareto optimal front. Subsequently, an ideal point method is utilized to achieve balanced scheduling solutions. Finally, the proposed approach is validated using actual production data collected from the site. Experimental results show that proposed model effectively addresses crane scheduling problem, offering decision-makers high-quality scheduling solutions.

Authors

Institutions

Publication Details

Published
2024-11-01
DOI
https://doi.org/10.1109/cac63892.2024.10865125
Citations
1
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Objective Optimization Method for Crane Scheduling in Steelmaking Workshop

Jingxin Wang, Ke Li
1 citations
Advanced Manufacturing and Logistics Optimization
0.35
article

Multi-Objective Optimization Method for Crane Scheduling in Steelmaking Workshop

Jingxin Wang, Ke Li
article en
1 citations

Abstract

In the steelmaking workshop, crane scheduling is a crucial logistics challenge affecting production efficiency and resource utilization. This study addresses the multi-machine, multi-task crane scheduling problem in steelmaking workshops by examining the associated temporal and spatial constraints. A multi-objective optimization model is formulated with the goals of minimizing total transport distance, passive transport distance, and waiting time. The model includes rules for resolving crane conflicts and employs the NSGA-II algorithm to identify the Pareto optimal front. Subsequently, an ideal point method is utilized to achieve balanced scheduling solutions. Finally, the proposed approach is validated using actual production data collected from the site. Experimental results show that proposed model effectively addresses crane scheduling problem, offering decision-makers high-quality scheduling solutions.

Automation Research and Design Institute of Metallurgical Industry (China) (CN)
Openalex Percentile: Top 31%
Advanced Manufacturing and Logistics Optimization
0.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.