Analysis and Scheduling for Flexible Job Shop Problem based on Unreliable Degraded Machine Model and Finite Buffers

In recent decades, the Flexible Job Shop Scheduling Problem (FJSP) has been widely studied. From a theoretical perspective, the FJSP with a fixed number of jobs has attracted significant attention. In actual production environments, machine performance can fluctuate due to factors such as workload and maintenance status, and machine performance does not remain constant but changes with the processing of workpieces. Therefore, it is necessary to study a FJSP model based on unreliable degraded machines and finite buffers. In this paper, a model of unreliable degraded machine is established, and the processing time of workpieces on degraded machines is calculated based on this model. Using the accurate processing times, an improved genetic algorithm is employed to solve the scheduling problem in flexible job shop production. The effectiveness of the algorithm is verified through numerical experiments.

Authors

Institutions

Publication Details

Published
2024-11-01
DOI
https://doi.org/10.1109/cac63892.2024.10865089
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis and Scheduling for Flexible Job Shop Problem based on Unreliable Degraded Machine Model and Finite Buffers

Zhiyang Jia, Sijie Yin, Minghao Duan, Jianchao Zhang et al.
Scheduling and Optimization Algorithms
article

Analysis and Scheduling for Flexible Job Shop Problem based on Unreliable Degraded Machine Model and Finite Buffers

Zhiyang Jia, Sijie Yin, Minghao Duan, Jianchao Zhang, Longyuan Shi, Panpan Shangguan
article en

Abstract

In recent decades, the Flexible Job Shop Scheduling Problem (FJSP) has been widely studied. From a theoretical perspective, the FJSP with a fixed number of jobs has attracted significant attention. In actual production environments, machine performance can fluctuate due to factors such as workload and maintenance status, and machine performance does not remain constant but changes with the processing of workpieces. Therefore, it is necessary to study a FJSP model based on unreliable degraded machines and finite buffers. In this paper, a model of unreliable degraded machine is established, and the processing time of workpieces on degraded machines is calculated based on this model. Using the accurate processing times, an improved genetic algorithm is employed to solve the scheduling problem in flexible job shop production. The effectiveness of the algorithm is verified through numerical experiments.

Beijing Institute of Technology (CN), Beijing Research Institute of Automation for Machinery Industry (China) (CN)
National Natural Science Foundation of China
Decent work and economic growth
Openalex Percentile: Top 60%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis and Scheduling for Flexible Job Shop Problem based on Unreliable Degraded Machine Model and Finite Buffers — Zhiyang Jia, Sijie Yin, et al. · (2024) | TGRS Research Map | TGRS