An inquiry into Amman bus rapid transit elements

Abstract. Bus rapid transit (BRT), labeled by modernized vehicles, dedicated bus ways, and utilization of intelligent transportation systems (ITS) technologies, is widely considered a cost-effective solution to provide affordable and effective transport service. This paper examines the infrastructure and operational elements of Amman BRT system using on-site investigations and open-source data. The research findings reveal that the public transportation sector in Amman has not experienced significant progress, with the Amman Bus and BRT corridor being the only notable advancements. The Amman BRT corridor consists of two physically separate routes with three main terminals: limited station design, minimal ITS capabilities, and an onboard fare collection system. Unfortunately, the absence of activated ITS at stations, Bus Priority at Traffic Signals, and off-board fare collection systems hinders the efficiency of Amman BRT. Limited integration with the transportation network reduces its potential and appeal to passengers. To improve the situation, it is necessary to enhance stations, activate ITS technologies, apply ride-station-based or trip-length-based fares, and integrate Amman BRT with the transportation network, especially the bus network. Additionally, more promotional efforts are required to inform the public of a project's current status and future initiatives.

Authors

Institutions

Publication Details

Journal
Materials research proceedings
Published
2025-02-12
DOI
https://doi.org/10.21741/9781644903414-99
Citations
1
Primary Topic
Transportation Planning and Optimization
Type
article
Field-Weighted Citation Impact
2.18
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An inquiry into Amman bus rapid transit elements

Rana Ibrahim Abid
1 citations
Materials research proceedings
Transportation Planning and Optimization
2.18
article

An inquiry into Amman bus rapid transit elements

Rana Ibrahim Abid
article en
1 citations

Abstract

Abstract. Bus rapid transit (BRT), labeled by modernized vehicles, dedicated bus ways, and utilization of intelligent transportation systems (ITS) technologies, is widely considered a cost-effective solution to provide affordable and effective transport service. This paper examines the infrastructure and operational elements of Amman BRT system using on-site investigations and open-source data. The research findings reveal that the public transportation sector in Amman has not experienced significant progress, with the Amman Bus and BRT corridor being the only notable advancements. The Amman BRT corridor consists of two physically separate routes with three main terminals: limited station design, minimal ITS capabilities, and an onboard fare collection system. Unfortunately, the absence of activated ITS at stations, Bus Priority at Traffic Signals, and off-board fare collection systems hinders the efficiency of Amman BRT. Limited integration with the transportation network reduces its potential and appeal to passengers. To improve the situation, it is necessary to enhance stations, activate ITS technologies, apply ride-station-based or trip-length-based fares, and integrate Amman BRT with the transportation network, especially the bus network. Additionally, more promotional efforts are required to inform the public of a project's current status and future initiatives.

Materials research proceedingsVol. 48
Jadara University (JO)
Openalex Percentile: Top 16%
Transportation Planning and Optimization
2.18
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.