Designing a Clearing Model for the Regional Electricity Spot Market Based on the Construction of the Provincial Electricity Market: A Case Study of the Yangtze River Delta Regional Electricity Market in China

Building the regional electricity spot market (RESM) in a representative area is an important move to promote the electricity market reform and new power system construction in China. In this paper, the RESM operation model and optimization method are established, which take into account the special power grid operation mechanism and market construction achievements in the provincial electricity spot market. Firstly, the influencing factors, core elements, market structure, and operation model of RESM construction in China are analyzed. Secondly, a bi-level optimization model of the RESM is established. The lower layer is the pre-clearing model of the provincial electricity spot market, which is used to optimize the unit combination strategy, considering unit operation constraints and power grid security constraints in the province. The upper layer is the optimization clearing model of the RESM, which is used to optimize the clearing price and adjust the unit operation strategy and inter-provincial electricity trading strategy, considering the security constraints of regional power grid tie lines. Finally, the RESM composed of power grids in the Yangtze River Delta region of China is simulated as an example. The analysis focuses on the operational state of the power grid after the operation of the RESM, considering its safety benefits, economic benefits, and environmental benefits. The optimization of the RESM can effectively solve the serious regional power grid congestion problem, which is achieved through the superposition and printing of pre-clearing results in various provinces, and the average daily cost of electricity purchasing in the region has been reduced by about CNY 11 million, while the annual cost has been reduced by about CNY 4 billion. In addition, the total carbon emissions have been reduced by 11,000 tons per day and 0.18 kg per kilowatt hour on average, and scenes without power abandonment account for more than 95% of the total scenes.

Authors

Institutions

Publication Details

Journal
Processes
Published
2025-02-10
DOI
https://doi.org/10.3390/pr13020492
Citations
2
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
1.46

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Designing a Clearing Model for the Regional Electricity Spot Market Based on the Construction of the Provincial Electricity Market: A Case Study of the Yangtze River Delta Regional Electricity Market in China

Yunjian Li, Haoxuan Chen, Fan Zhang, Cong Ye et al.
2 citations
Processes
Electric Power System Optimization
1.46
article

Designing a Clearing Model for the Regional Electricity Spot Market Based on the Construction of the Provincial Electricity Market: A Case Study of the Yangtze River Delta Regional Electricity Market in China

Yunjian Li, Haoxuan Chen, Fan Zhang, Cong Ye, Lizi Zhang
article en
2 citations

Abstract

Building the regional electricity spot market (RESM) in a representative area is an important move to promote the electricity market reform and new power system construction in China. In this paper, the RESM operation model and optimization method are established, which take into account the special power grid operation mechanism and market construction achievements in the provincial electricity spot market. Firstly, the influencing factors, core elements, market structure, and operation model of RESM construction in China are analyzed. Secondly, a bi-level optimization model of the RESM is established. The lower layer is the pre-clearing model of the provincial electricity spot market, which is used to optimize the unit combination strategy, considering unit operation constraints and power grid security constraints in the province. The upper layer is the optimization clearing model of the RESM, which is used to optimize the clearing price and adjust the unit operation strategy and inter-provincial electricity trading strategy, considering the security constraints of regional power grid tie lines. Finally, the RESM composed of power grids in the Yangtze River Delta region of China is simulated as an example. The analysis focuses on the operational state of the power grid after the operation of the RESM, considering its safety benefits, economic benefits, and environmental benefits. The optimization of the RESM can effectively solve the serious regional power grid congestion problem, which is achieved through the superposition and printing of pre-clearing results in various provinces, and the average daily cost of electricity purchasing in the region has been reduced by about CNY 11 million, while the annual cost has been reduced by about CNY 4 billion. In addition, the total carbon emissions have been reduced by 11,000 tons per day and 0.18 kg per kilowatt hour on average, and scenes without power abandonment account for more than 95% of the total scenes.

ProcessesVol. 13(2)
North China Electric Power University (CN)
State Grid Corporation of China
Openalex Percentile: Top 19%
Electric Power System Optimization
1.46
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.