Power transmission network planning under uncertainties

The optimization of load flow analysis is crucial for the efficient observation of the impact of new power plants into existing electricity power systems (EPS). The advent of integration of new energy sources has reduced construction timeline requirements to 4-5 years, creating a lag in the development of supporting electricity infrastructure. This paper explores the spatial and temporal dimensions of EPS development planning, illustrated through the example of two new connection requests to a transmission network, with emphasis on importance of load flow optimization and the potential failure analysis to meet the (N-1) contingency criterion, which ensures system reliability during outages. This paper underscores the necessity of strategic planning in EPS development to accommodate new generation units while maintaining system stability and reliability at the satisfactory levels.

Authors

Institutions

Publication Details

Published
2024-10-14
DOI
https://doi.org/10.1109/isgteurope62998.2024.10863018
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Power transmission network planning under uncertainties

Ninoslav Holjevac, Ivica Pavić, N. Vukadinovic
Smart Grid and Power Systems
article

Power transmission network planning under uncertainties

Ninoslav Holjevac, Ivica Pavić, N. Vukadinovic
article en

Abstract

The optimization of load flow analysis is crucial for the efficient observation of the impact of new power plants into existing electricity power systems (EPS). The advent of integration of new energy sources has reduced construction timeline requirements to 4-5 years, creating a lag in the development of supporting electricity infrastructure. This paper explores the spatial and temporal dimensions of EPS development planning, illustrated through the example of two new connection requests to a transmission network, with emphasis on importance of load flow optimization and the potential failure analysis to meet the (N-1) contingency criterion, which ensures system reliability during outages. This paper underscores the necessity of strategic planning in EPS development to accommodate new generation units while maintaining system stability and reliability at the satisfactory levels.

University of Zagreb (HR)
Openalex Percentile: Top 75%
Smart Grid and Power Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.