Impacts of probabilistically sized reserves on the operation of the Senegalese electrical grid

This paper aims at providing insights into the evolution of the operation costs of Senegal’s electrical grid and the fulfillment of system reserve needs while frequency control reserves are sized probabilistically. Control Reserves are used by Transmission System Operators (TSO) to cope for disturbances and limit frequency deviation from nominal set-point as small as possible. Historically they have been sized in a deterministic manner. However, with the advent of more intermittent Renewable Energy Sources (RES), there is a need of paradigm shift towards a probabilistic sizing methodology which enables a better coverage of weather-induced disturbances. Such a probabilistic sizing method entails a choice of percentile defining the span of disturbances to cover. Afterwards, the reserve needs sized must be partitioned between the different control reserves. Using historical data of Senegal’s electrical grid, it will be assessed how grid operation is impacted by the percentile choice as well as the partition of reserve needs if a probabilistic sizing approach were to be used.

Authors

Institutions

Publication Details

Published
2024-10-14
DOI
https://doi.org/10.1109/isgteurope62998.2024.10863728
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impacts of probabilistically sized reserves on the operation of the Senegalese electrical grid

Alioune Badara Mboup, Pierre Henneaux, Ababacar Niang, Maouly Fall
Electric Power System Optimization
article

Impacts of probabilistically sized reserves on the operation of the Senegalese electrical grid

Alioune Badara Mboup, Pierre Henneaux, Ababacar Niang, Maouly Fall
article en

Abstract

This paper aims at providing insights into the evolution of the operation costs of Senegal’s electrical grid and the fulfillment of system reserve needs while frequency control reserves are sized probabilistically. Control Reserves are used by Transmission System Operators (TSO) to cope for disturbances and limit frequency deviation from nominal set-point as small as possible. Historically they have been sized in a deterministic manner. However, with the advent of more intermittent Renewable Energy Sources (RES), there is a need of paradigm shift towards a probabilistic sizing methodology which enables a better coverage of weather-induced disturbances. Such a probabilistic sizing method entails a choice of percentile defining the span of disturbances to cover. Afterwards, the reserve needs sized must be partitioned between the different control reserves. Using historical data of Senegal’s electrical grid, it will be assessed how grid operation is impacted by the percentile choice as well as the partition of reserve needs if a probabilistic sizing approach were to be used.

Université Libre de Bruxelles (BE), Cheikh Anta Diop University (SN)
Openalex Percentile: Top 75%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Impacts of probabilistically sized reserves on the operation of the Senegalese electrical grid — Alioune Badara Mboup, Pierre Henneaux, et al. · (2024) | TGRS Research Map | TGRS