Reactive Power Retrieval at the TSO-DSO Interface in Germany: Identifying Approaches and Challenges

The decommissioning of conventional power plants in Germany leads to the reduction of reliable reactive power sources available in the transmission grid. The rising grid volatility and voltage sensitivity make it more difficult to predict critical voltage-related congestions and events. The use of the reactive power provided by renewable energy plants at the distribution grid level is proving to be promising for the congestion management of transmission system operators. The paper presents a testbed to evaluate, if procedures and regulations from existing congestion management instrument such as the German Redispatch 2.0 Process is suitable for reactive power. While previous research in the literature has been methodologically focused, the emphasis of this paper is on the presentation of the entire process in the testbed, to investigate the methodological and processual challenges during the retrieval at the TSO-DSO interface in C2RT. For this, relevant case studies are defined.

Authors

Institutions

Publication Details

Published
2024-10-14
DOI
https://doi.org/10.1109/isgteurope62998.2024.10863326
Primary Topic
Physics and Engineering Research Articles
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reactive Power Retrieval at the TSO-DSO Interface in Germany: Identifying Approaches and Challenges

Steffen Schlegel, Dirk Westermann, Nadja Isabelle Belz, Jannes Grünberg
Physics and Engineering Research Articles
article

Reactive Power Retrieval at the TSO-DSO Interface in Germany: Identifying Approaches and Challenges

Steffen Schlegel, Dirk Westermann, Nadja Isabelle Belz, Jannes Grünberg
article en

Abstract

The decommissioning of conventional power plants in Germany leads to the reduction of reliable reactive power sources available in the transmission grid. The rising grid volatility and voltage sensitivity make it more difficult to predict critical voltage-related congestions and events. The use of the reactive power provided by renewable energy plants at the distribution grid level is proving to be promising for the congestion management of transmission system operators. The paper presents a testbed to evaluate, if procedures and regulations from existing congestion management instrument such as the German Redispatch 2.0 Process is suitable for reactive power. While previous research in the literature has been methodologically focused, the emphasis of this paper is on the presentation of the entire process in the testbed, to investigate the methodological and processual challenges during the retrieval at the TSO-DSO interface in C2RT. For this, relevant case studies are defined.

Technische Universität Ilmenau (DE)
Openalex Percentile: Top 72%
Physics and Engineering Research Articles
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.