Non-Convex AC/DC Static Transmission Expansion Planning Considering Energy Storage Systems and Uncertainty

The integration of non-dispatchable renewable energy sources increases demands for the inclusion of modern technologies, such as High Voltage Direct Current (HVDC) links and Energy Storage Systems (ESS), in the network expansion planning. Also, the current and future power network complexity demands more accurate models to provide more realistic solutions for the transmission expansion planning problem. However, there are no approaches that allow the selection of the proper technology in a unified and accurate TNEP formulation. This article proposes a non-convex formulation to solve the problem, using AC/DC transmission links and ESS. The Iterated Greedy (IG) algorithm is employed as an optimization technique to find good quality solutions. Since uncertainty in load and generation scenarios significantly impacts the Transmission Network Expansion Planning (TNEP), the Monte Carlo Simulation (MCS) technique is used to deal with their stochastic behavior. The advantages of the proposed approach are illustrated using a modified 6-bus Garver test system.

Authors

Institutions

Publication Details

Published
2024-10-14
DOI
https://doi.org/10.1109/isgteurope62998.2024.10863357
Primary Topic
Microgrid Control and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Non-Convex AC/DC Static Transmission Expansion Planning Considering Energy Storage Systems and Uncertainty

Edgar G. Morquecho, Santiago P. Torres, Dirk Van Hertem, José Jara-Alvear et al.
Microgrid Control and Optimization
article

Non-Convex AC/DC Static Transmission Expansion Planning Considering Energy Storage Systems and Uncertainty

Edgar G. Morquecho, Santiago P. Torres, Dirk Van Hertem, José Jara-Alvear, Hakan Ergun, Miguel Torres, Jorge E. Idrovo, Mateo D. Llivisaca
article en

Abstract

The integration of non-dispatchable renewable energy sources increases demands for the inclusion of modern technologies, such as High Voltage Direct Current (HVDC) links and Energy Storage Systems (ESS), in the network expansion planning. Also, the current and future power network complexity demands more accurate models to provide more realistic solutions for the transmission expansion planning problem. However, there are no approaches that allow the selection of the proper technology in a unified and accurate TNEP formulation. This article proposes a non-convex formulation to solve the problem, using AC/DC transmission links and ESS. The Iterated Greedy (IG) algorithm is employed as an optimization technique to find good quality solutions. Since uncertainty in load and generation scenarios significantly impacts the Transmission Network Expansion Planning (TNEP), the Monte Carlo Simulation (MCS) technique is used to deal with their stochastic behavior. The advantages of the proposed approach are illustrated using a modified 6-bus Garver test system.

University of Cuenca (EC), Escuela Superior Politecnica del Litoral (EC), Universidad del Azuay (EC), KU Leuven (BE)
Affordable and clean energy
Openalex Percentile: Top 67%
Microgrid Control and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Non-Convex AC/DC Static Transmission Expansion Planning Considering Energy Storage Systems and Uncertainty — Edgar G. Morquecho, Santiago P. Torres, et al. · (2024) | TGRS Research Map | TGRS