Unveiling R&D Project Timelines with AI

Predictive analytics in project management has the power to reshape the way we forecast and manage project timelines, paving the way for enhanced efficiency and favourable project results. This research evaluates machine learning models for predicting time required for projects based on project titles and ancillary features. Utilizing feature selection techniques, including Chi-Squared and scikit-learn, we refined our dataset by removing redundant and noisy features to enhance model performance and generalizability. The preprocessing sequence incorporated categorical encoding, and feature scaling to standardize inputs to the model. We implemented and benchmarked predictive models-Random Forest Regressor, Neural Network, Support Vector Regressor, and Gradient Boosting Regressor. Model efficacy was quantified using Mean Squared Error (MSE), Mean Absolute Error (MAE), and <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$\mathrm{R}^{2}$</tex> Score. Our results indicate that ensemble methods, particularly Random Forest and Gradient Boosting, exhibit good accuracy in capturing complex nonlinear dependencies within project data. This study demonstrates the significance of meticulous feature engineering and selection in machine learning-driven project management, providing a detailed comparative analysis of model performances for delay prediction. We achieved an MSE of 0.09 through our research, underscoring the effectiveness of our approach in accurately predicting project timelines.

Authors

Institutions

Publication Details

Published
2024-11-21
DOI
https://doi.org/10.1109/delcon64804.2024.10866495
Citations
3
Primary Topic
Big Data and Business Intelligence
Type
article
Field-Weighted Citation Impact
1.59
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Unveiling R&D Project Timelines with AI

Raghav Chopra, Sumit Goswami
3 citations
Big Data and Business Intelligence
1.59
article

Unveiling R&D Project Timelines with AI

Raghav Chopra, Sumit Goswami
article en
3 citations

Abstract

Predictive analytics in project management has the power to reshape the way we forecast and manage project timelines, paving the way for enhanced efficiency and favourable project results. This research evaluates machine learning models for predicting time required for projects based on project titles and ancillary features. Utilizing feature selection techniques, including Chi-Squared and scikit-learn, we refined our dataset by removing redundant and noisy features to enhance model performance and generalizability. The preprocessing sequence incorporated categorical encoding, and feature scaling to standardize inputs to the model. We implemented and benchmarked predictive models-Random Forest Regressor, Neural Network, Support Vector Regressor, and Gradient Boosting Regressor. Model efficacy was quantified using Mean Squared Error (MSE), Mean Absolute Error (MAE), and <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$\mathrm{R}^{2}$</tex> Score. Our results indicate that ensemble methods, particularly Random Forest and Gradient Boosting, exhibit good accuracy in capturing complex nonlinear dependencies within project data. This study demonstrates the significance of meticulous feature engineering and selection in machine learning-driven project management, providing a detailed comparative analysis of model performances for delay prediction. We achieved an MSE of 0.09 through our research, underscoring the effectiveness of our approach in accurately predicting project timelines.

Guru Nanak Dev University (IN)
Industry, innovation and infrastructure
Openalex Percentile: Top 12%
Big Data and Business Intelligence
1.59
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.