Development and Deployment of Generic Models for Grid Code Compliance Studies

A challenge faced by many Transmission System Operators (TSO) is how to adequately represent Inverter Based Resources (IBR) within TSO network models. At present most TSOs require a series of Grid Code compliance studies to be provided as part of the connection process, which use detailed vendor models. These are often encrypted, very detailed and contain multiple instances of the same controller for each sub-unit within a plant. This can be challenging to implement into existing TSO network models, and thus becomes a significant time and cost constraint. This paper demonstrates that the majority of IBR plant and the associated performance requirements, can be adequately represented using generic open source aggregated WECC models. A 50 MW, Battery Energy Storage System (BESS) plant connected to the UK network, following the UK Grid Code / RfG requirements, is studied by developing and deploying a aggregated Western Electricity Coordinating Council (WECC) model in DIgSILENT Powerfactory and is presented as a benchmark system.

Authors

Institutions

Publication Details

Published
2024-10-14
DOI
https://doi.org/10.1109/isgteurope62998.2024.10863448
Primary Topic
Distributed and Parallel Computing Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development and Deployment of Generic Models for Grid Code Compliance Studies

Gareth Taylor, Stephen Sommerville, Maysam Abbod
Distributed and Parallel Computing Systems
article

Development and Deployment of Generic Models for Grid Code Compliance Studies

Gareth Taylor, Stephen Sommerville, Maysam Abbod
article en

Abstract

A challenge faced by many Transmission System Operators (TSO) is how to adequately represent Inverter Based Resources (IBR) within TSO network models. At present most TSOs require a series of Grid Code compliance studies to be provided as part of the connection process, which use detailed vendor models. These are often encrypted, very detailed and contain multiple instances of the same controller for each sub-unit within a plant. This can be challenging to implement into existing TSO network models, and thus becomes a significant time and cost constraint. This paper demonstrates that the majority of IBR plant and the associated performance requirements, can be adequately represented using generic open source aggregated WECC models. A 50 MW, Battery Energy Storage System (BESS) plant connected to the UK network, following the UK Grid Code / RfG requirements, is studied by developing and deploying a aggregated Western Electricity Coordinating Council (WECC) model in DIgSILENT Powerfactory and is presented as a benchmark system.

Brunel University of London (GB)
Openalex Percentile: Top 68%
Distributed and Parallel Computing Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.