Cost and Time Overrun of Public Infrastructure Project in The Philippines: Inhibiting Factors and Mitigating Measures

Time and cost overruns in the implementation of infrastructure pro-jects are endless, as appears in all the implementing agencies of the government. According to the recent report of the state auditor, pro-jects were not completed within the specific contract time, while the socioeconomic planning body reported cost overruns on several big-ticket projects. This study proposes a frame of factors influencing overruns and mitigation actions as a contribution to the risk analy-sis of the implementation of projects as well as the project manage-ment initiative in monitoring and control of projects. By analyzing the datasets from Metro Manila, this study identified the most prevalent influencing factor of cost and time overruns faced in the implementation of infrastructure projects and developed measures to mitigate overruns. A total of 196 professionals responded to a questionnaire, and 12 participants were involved in unstructured interviews, which supported the data and results. To interpret and validate the data gathered, a relative importance index and a one-way analysis of variance test were used. The study revealed that the influencing factors leading to time overruns are inaccurate budget-ing, location of site, suspension of work, land acquisition, and varia-tion order, while for the cost overrun factors, inaccurate budgeting, variation order, inadequate project planning, market conditions, and inadequate site investigations prevail. A relationship between the perceptions of the 3 groups, namely the contractor, consultant, and implementing agency, with regards to the cost overrun factors was significant. However, with regards to the time overrun factors, they are not significant.

Authors

Institutions

Publication Details

Journal
International Journal of Multidisciplinary Applied Business and Education Research
Published
2024-12-30
DOI
https://doi.org/10.11594/ijmaber.05.12.30
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost and Time Overrun of Public Infrastructure Project in The Philippines: Inhibiting Factors and Mitigating Measures

Jim Davis J. Layno, Jerome Jordan F. Famadico
International Journal of Multidisciplinary Applied Business and Education Research
Public-Private Partnership Projects
article

Cost and Time Overrun of Public Infrastructure Project in The Philippines: Inhibiting Factors and Mitigating Measures

Jim Davis J. Layno, Jerome Jordan F. Famadico
article en

Abstract

Time and cost overruns in the implementation of infrastructure pro-jects are endless, as appears in all the implementing agencies of the government. According to the recent report of the state auditor, pro-jects were not completed within the specific contract time, while the socioeconomic planning body reported cost overruns on several big-ticket projects. This study proposes a frame of factors influencing overruns and mitigation actions as a contribution to the risk analy-sis of the implementation of projects as well as the project manage-ment initiative in monitoring and control of projects. By analyzing the datasets from Metro Manila, this study identified the most prevalent influencing factor of cost and time overruns faced in the implementation of infrastructure projects and developed measures to mitigate overruns. A total of 196 professionals responded to a questionnaire, and 12 participants were involved in unstructured interviews, which supported the data and results. To interpret and validate the data gathered, a relative importance index and a one-way analysis of variance test were used. The study revealed that the influencing factors leading to time overruns are inaccurate budget-ing, location of site, suspension of work, land acquisition, and varia-tion order, while for the cost overrun factors, inaccurate budgeting, variation order, inadequate project planning, market conditions, and inadequate site investigations prevail. A relationship between the perceptions of the 3 groups, namely the contractor, consultant, and implementing agency, with regards to the cost overrun factors was significant. However, with regards to the time overrun factors, they are not significant.

International Journal of Multidisciplinary Applied Business and Education ResearchVol. 5(12)
Adamson University (PH)
Openalex Percentile: Top 53%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.