Effect of Project Life Cycle Management on Project Performance in Rwanda: A Case of Learning Through Play (LTP) Project in Bugesera District

This study investigates the effect of Project Life Cycle Management (PLCM) on the performance of the Learning Through Play (LTP) Project in Bugesera District, Rwanda.Specifically, the study evaluates the impact of project identification on the overall project performance in Bugesera District.Anchored in Project Management Theory, the study employed correlational and descriptive research designs, utilizing both quantitative and qualitative methods.A sample of 138 respondents was surveyed, with data collected through questionnaires and interviews.SPSS Version 23.0 was used to analyze the data, with findings presented using descriptive statistics, correlation analysis, and regression models.The results revealed a strong positive relationship between the project life cycle management practices and project performance, with the correlation coefficients for project identification with project performance (r = 0.617).Regression analysis confirmed that project identification is a significant predictor of project performance, with a p-value of 0.000, indicating statistical significance.In conclusion, the study emphasizes the importance of comprehensive project identification in improving the performance of the LTP Project.Based on these findings, the study recommends that the LTP Project should invest in improving the clarity and communication of roles and responsibilities across departments.This will ensure that all team members are aligned, collaborate effectively, and avoid any misunderstandings or inefficiencies during the project execution phase.Regularly updating terms of reference and providing clarity in job roles will further enhance project cohesion and success.

Publication Details

Journal
Journal of Research Innovation and Implications in Education
Published
2025-02-10
DOI
https://doi.org/10.59765/bhr83hy
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effect of Project Life Cycle Management on Project Performance in Rwanda: A Case of Learning Through Play (LTP) Project in Bugesera District

Journal of Research Innovation and Implications in Education
Construction Project Management and Performance
article

Effect of Project Life Cycle Management on Project Performance in Rwanda: A Case of Learning Through Play (LTP) Project in Bugesera District

article en

Abstract

This study investigates the effect of Project Life Cycle Management (PLCM) on the performance of the Learning Through Play (LTP) Project in Bugesera District, Rwanda.Specifically, the study evaluates the impact of project identification on the overall project performance in Bugesera District.Anchored in Project Management Theory, the study employed correlational and descriptive research designs, utilizing both quantitative and qualitative methods.A sample of 138 respondents was surveyed, with data collected through questionnaires and interviews.SPSS Version 23.0 was used to analyze the data, with findings presented using descriptive statistics, correlation analysis, and regression models.The results revealed a strong positive relationship between the project life cycle management practices and project performance, with the correlation coefficients for project identification with project performance (r = 0.617).Regression analysis confirmed that project identification is a significant predictor of project performance, with a p-value of 0.000, indicating statistical significance.In conclusion, the study emphasizes the importance of comprehensive project identification in improving the performance of the LTP Project.Based on these findings, the study recommends that the LTP Project should invest in improving the clarity and communication of roles and responsibilities across departments.This will ensure that all team members are aligned, collaborate effectively, and avoid any misunderstandings or inefficiencies during the project execution phase.Regularly updating terms of reference and providing clarity in job roles will further enhance project cohesion and success.

Journal of Research Innovation and Implications in Education
Responsible consumption and production
Openalex Percentile: Top 98%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.