A Hybrid and Intuitive Work Packaging Approach with Multiple Task Relations, General Work Package Precedence, and BIM in Modular Construction

A work package is an element of the work breakdown structure, which includes tasks, deliverables, and all necessary details for execution by a designated team. In modular construction (MC) production, effective work packaging is crucial for ensuring efficient task execution, reducing project costs, and maintaining schedules. However, existing research on work packaging primarily focuses on tasks with single precedence relationships, overlooking the complex task dependencies that can arise in MC production, such as parallel and cyclic tasks. To address this issue, this study proposes a hybrid and intuitive work packaging (HIWP) approach that allows concurrent execution of work packages and visualizes work packaging results. First, at the task level, we expand task type identification by incorporating parallel and cyclic tasks. Second, at the work package level, a heuristic algorithm was developed to optimize work package sizing under the general precedence relation (GPR), which allows work packages to overlap during execution. Finally, a web-based platform was developed by integrating building information modeling (BIM) technology. The contribution of this study contains a GPR-based work package sizing method, which allows the simultaneous execution of work packages, significantly improving the efficiency and accuracy of work packaging in MC projects. Additionally, an integrated BIM-based platform is developed to facilitate the visualization, querying, and communication of work package results. Experimental results demonstrate an 8.1% cost reduction compared with existing methods. Additionally, HIWP shows a 40% potential cost reduction in simulation experiments and provides up to five times faster response when adjusting to shortened project durations.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-02-11
DOI
https://doi.org/10.1061/jcemd4.coeng-15856
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
2.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Hybrid and Intuitive Work Packaging Approach with Multiple Task Relations, General Work Package Precedence, and BIM in Modular Construction

Yue Teng, Zisheng Liu, Yaning Zhang, Chengke Wu et al.
2 citations
Journal of Construction Engineering and Management
BIM and Construction Integration
2.01
article

A Hybrid and Intuitive Work Packaging Approach with Multiple Task Relations, General Work Package Precedence, and BIM in Modular Construction

Yue Teng, Zisheng Liu, Yaning Zhang, Chengke Wu, Zhiwei Gao, Xiao Li
article en
2 citations

Abstract

A work package is an element of the work breakdown structure, which includes tasks, deliverables, and all necessary details for execution by a designated team. In modular construction (MC) production, effective work packaging is crucial for ensuring efficient task execution, reducing project costs, and maintaining schedules. However, existing research on work packaging primarily focuses on tasks with single precedence relationships, overlooking the complex task dependencies that can arise in MC production, such as parallel and cyclic tasks. To address this issue, this study proposes a hybrid and intuitive work packaging (HIWP) approach that allows concurrent execution of work packages and visualizes work packaging results. First, at the task level, we expand task type identification by incorporating parallel and cyclic tasks. Second, at the work package level, a heuristic algorithm was developed to optimize work package sizing under the general precedence relation (GPR), which allows work packages to overlap during execution. Finally, a web-based platform was developed by integrating building information modeling (BIM) technology. The contribution of this study contains a GPR-based work package sizing method, which allows the simultaneous execution of work packages, significantly improving the efficiency and accuracy of work packaging in MC projects. Additionally, an integrated BIM-based platform is developed to facilitate the visualization, querying, and communication of work package results. Experimental results demonstrate an 8.1% cost reduction compared with existing methods. Additionally, HIWP shows a 40% potential cost reduction in simulation experiments and provides up to five times faster response when adjusting to shortened project durations.

Journal of Construction Engineering and ManagementVol. 151(4)
Hong Kong Polytechnic University (HK), Northwestern Polytechnical University (CN), Chinese Academy of Sciences (CN), Qingdao Installation & Construction (China) (CN), China State Construction Engineering (China) (CN)
Openalex Percentile: Top 17%
BIM and Construction Integration
2.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.