Assessment of factors inhibiting engagement of quantity surveyors on private residential building projects in Ado-Ekiti, Nigeria

Purpose The study examined the factors inhibiting the engagement of Quantity Surveyors (QS) on private residential building projects in Ado-Ekiti, Nigeria with a view to enhance the performance of such projects. Design/methodology/approach The study used a qualitative research approach with the use of interview protocol for data collection. A Convenient sampling method was used to select 20 on-going residential building construction projects for the study in the Government Reserved Area, Ado Ekiti, Ekiti State, Nigeria. The client and the architect of the selected projects were the population of research for interview. For data analysis, 28 successful interviews were used, while frequency, percentile and content analysis were the method of data analysis used. Findings The result indicated that the most important factor inhibiting the engagement of QSs on private residential building projects is lack of awareness of the benefit inherent in engagement of QS on residential projects. Other important factors are; the perception that engagement of QS will increase the construction cost, absence of legislation that mandate engagement of QS, usurpation of Quantity Surveyor’s roles by other professionals and the perception that engagement of QS is essential only in big projects. Practical implications It was recommended that every state chapter of the Nigerian Institute of Quantity Surveyors (NIQS) should start a series of awareness campaign program within their State to enlighten the populace on the services that a professional QS can offer them with emphasis on the benefits of engaging QS on the small scale projects such as residential building projects. More recommendation has it that as a matter of policy and requirement for building approval criteria, deliverables from QS should be made compulsory. This measure will help every potential residential building client to see QS as an important professional that must be engaged before their project can be successfully delivered. Originality/value The study attempted to investigate the factors inhibiting the engagement of QS on private residential building construction projects. This was motivated by the perceived prevalent of non-engagement of QS in the study area with the attendant poor project performance.

Authors

Institutions

Publication Details

Journal
Journal of Financial Management of Property and Construction
Published
2025-02-07
DOI
https://doi.org/10.1108/jfmpc-06-2023-0033
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessment of factors inhibiting engagement of quantity surveyors on private residential building projects in Ado-Ekiti, Nigeria

Nathaniel Ayinde Olatunde, Bosede Olajumoke Adebayo, Imoleayo Abraham Awodele, Sola Samuel Makanjuola
2 citations
Journal of Financial Management of Property and Construction
Construction Project Management and Performance
4.21
article

Assessment of factors inhibiting engagement of quantity surveyors on private residential building projects in Ado-Ekiti, Nigeria

Nathaniel Ayinde Olatunde, Bosede Olajumoke Adebayo, Imoleayo Abraham Awodele, Sola Samuel Makanjuola
article en
2 citations

Abstract

Purpose The study examined the factors inhibiting the engagement of Quantity Surveyors (QS) on private residential building projects in Ado-Ekiti, Nigeria with a view to enhance the performance of such projects. Design/methodology/approach The study used a qualitative research approach with the use of interview protocol for data collection. A Convenient sampling method was used to select 20 on-going residential building construction projects for the study in the Government Reserved Area, Ado Ekiti, Ekiti State, Nigeria. The client and the architect of the selected projects were the population of research for interview. For data analysis, 28 successful interviews were used, while frequency, percentile and content analysis were the method of data analysis used. Findings The result indicated that the most important factor inhibiting the engagement of QSs on private residential building projects is lack of awareness of the benefit inherent in engagement of QS on residential projects. Other important factors are; the perception that engagement of QS will increase the construction cost, absence of legislation that mandate engagement of QS, usurpation of Quantity Surveyor’s roles by other professionals and the perception that engagement of QS is essential only in big projects. Practical implications It was recommended that every state chapter of the Nigerian Institute of Quantity Surveyors (NIQS) should start a series of awareness campaign program within their State to enlighten the populace on the services that a professional QS can offer them with emphasis on the benefits of engaging QS on the small scale projects such as residential building projects. More recommendation has it that as a matter of policy and requirement for building approval criteria, deliverables from QS should be made compulsory. This measure will help every potential residential building client to see QS as an important professional that must be engaged before their project can be successfully delivered. Originality/value The study attempted to investigate the factors inhibiting the engagement of QS on private residential building construction projects. This was motivated by the perceived prevalent of non-engagement of QS in the study area with the attendant poor project performance.

Journal of Financial Management of Property and ConstructionVol. 30(2)
Durban University of Technology (ZA), Federal University Oye Ekiti (NG)
Openalex Percentile: Top 8%
Construction Project Management and Performance
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.