Design and Construction of a Pico Hydro Power Plant Using a Turgo Turbine on the Bah-Biak Waterfall Flow

One of the main forms of energy needed for electrical equipment is electrical energy, The potential for hydropower in Indonesia is 75 GW, mostly spread across Sumatra, Sulawesi, Kalimantan, and Papua. The problem of water energy sources that are not utilized to become electrical energy is the purpose of this study. So in this study, utilizing the energy of the Bah-Biak waterfall which is a hydropower potential located in Sidamanik District, Simalungun Regency, North Sumatra Province, Indonesia. This waterfall has a fairly stable flow, then a turbo turbine is used for the Pico hydropower plant. Based on the test results, the results obtained with a Nozzle distance of 20 cm, a generator rotation speed is 964.4 RPM, a voltage value is 13.8 V and a current generated is 1.21 A. While at a Nozzle distance of 60 cm, the generator rotation speed is 876.8 RPM, the voltage value is 13.35 V and the current generated is 0.92 A. The highest power generated by a pico hydro power plant with a turbo turbine with a Nozzle distance of 20 cm and a water discharge of 23 is 19.86 Watts.

Authors

Institutions

Publication Details

Published
2024-11-21
DOI
https://doi.org/10.1109/elticom64085.2024.10865199
Primary Topic
Cavitation Phenomena in Pumps
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and Construction of a Pico Hydro Power Plant Using a Turgo Turbine on the Bah-Biak Waterfall Flow

Yulianta Siregar, Daniel Ortega Manik
Cavitation Phenomena in Pumps
article

Design and Construction of a Pico Hydro Power Plant Using a Turgo Turbine on the Bah-Biak Waterfall Flow

Yulianta Siregar, Daniel Ortega Manik
article en

Abstract

One of the main forms of energy needed for electrical equipment is electrical energy, The potential for hydropower in Indonesia is 75 GW, mostly spread across Sumatra, Sulawesi, Kalimantan, and Papua. The problem of water energy sources that are not utilized to become electrical energy is the purpose of this study. So in this study, utilizing the energy of the Bah-Biak waterfall which is a hydropower potential located in Sidamanik District, Simalungun Regency, North Sumatra Province, Indonesia. This waterfall has a fairly stable flow, then a turbo turbine is used for the Pico hydropower plant. Based on the test results, the results obtained with a Nozzle distance of 20 cm, a generator rotation speed is 964.4 RPM, a voltage value is 13.8 V and a current generated is 1.21 A. While at a Nozzle distance of 60 cm, the generator rotation speed is 876.8 RPM, the voltage value is 13.35 V and the current generated is 0.92 A. The highest power generated by a pico hydro power plant with a turbo turbine with a Nozzle distance of 20 cm and a water discharge of 23 is 19.86 Watts.

Universitas Sumatera Utara (ID)
Openalex Percentile: Top 70%
Cavitation Phenomena in Pumps
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.