Optimization methods for construction schedules to enhance project efficiency

This article examines modern methodological developments in the field of construction schedule optimization as a tool to improve the management efficiency of related projects. The relevance of the topic is justified by the urgent need to adapt traditional planning approaches to the realities of digitalization, the growth of project scales, and the complexity of infrastructure design. The aim of the study is to systematize and characterize approaches that ensure the minimization of time and resource costs (without compromising the quality of construction work). Following a review of contemporary scientific literature, discrepancies have been identified regarding the choice of optimal methods for different types of projects: on one hand, research shows high effectiveness of automated technologies (such as 4D BIM), while on the other hand, their implementation is often significantly limited by economic and organizational determinants. The conclusion is made that successful optimization actions in this area require the integration of classical methods (CPM, PERT) with adaptive algorithms and mathematical models. The author's contribution lies in the formulation of recommendations for improving the efficiency of construction schedules (a specific sequence of actions is proposed, taking into account both external and internal challenges). The materials presented will be useful for project managers, engineers, and researchers focused on improving the efficiency of construction processes.

Authors

Institutions

Publication Details

Journal
The American Journal of Engineering And Technology
Published
2025-02-01
DOI
https://doi.org/10.37547/tajet/volume07issue02-03
Primary Topic
Construction Management and Sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization methods for construction schedules to enhance project efficiency

Mehdi Huseynov
The American Journal of Engineering And Technology
Construction Management and Sustainability
article

Optimization methods for construction schedules to enhance project efficiency

Mehdi Huseynov
article en

Abstract

This article examines modern methodological developments in the field of construction schedule optimization as a tool to improve the management efficiency of related projects. The relevance of the topic is justified by the urgent need to adapt traditional planning approaches to the realities of digitalization, the growth of project scales, and the complexity of infrastructure design. The aim of the study is to systematize and characterize approaches that ensure the minimization of time and resource costs (without compromising the quality of construction work). Following a review of contemporary scientific literature, discrepancies have been identified regarding the choice of optimal methods for different types of projects: on one hand, research shows high effectiveness of automated technologies (such as 4D BIM), while on the other hand, their implementation is often significantly limited by economic and organizational determinants. The conclusion is made that successful optimization actions in this area require the integration of classical methods (CPM, PERT) with adaptive algorithms and mathematical models. The author's contribution lies in the formulation of recommendations for improving the efficiency of construction schedules (a specific sequence of actions is proposed, taking into account both external and internal challenges). The materials presented will be useful for project managers, engineers, and researchers focused on improving the efficiency of construction processes.

The American Journal of Engineering And TechnologyVol. 7(2)
Jule (United States) (US)
Industry, innovation and infrastructure
Openalex Percentile: Top 98%
Construction Management and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization methods for construction schedules to enhance project efficiency — Mehdi Huseynov · The American Journal of Engineering And Technology (2025) | TGRS Research Map | TGRS