Analysis of Causes for Extension of Time in Construction Projects: A Case Study of Kageshwori Manohara Municipality

Extension of Time (EoT) claims are a common occurrence in construction projects worldwide, often leading to disputes due to insufficient attention to delay causes during the contract initiation phase. However, in the context of Kageshwori Manohara Municipality, these challenges are particularly pronounced due to localized factors. This study identifies key causes of EoT through qualitative and quantitative analyses, utilizing Principal Component Analysis (PCA), Kaiser-Meyer-Olkin (KMO) testing, Bartlett's Test of Sphericity, Eigenvalue and variance analysis, and reliability assessments using Cronbach's Alpha. Principal Component Analysis (PCA) helped to categorize twelve major EoT causes into three components: Design and Consultant-Related Issues (Eigenvalue: 13.892, Variance: 55.57%), Project Management and Execution Challenges (Eigenvalue: 1.146, Variance: 4.58%), and External and Unforeseen Conditions (Eigenvalue: 1.000, Variance: 4.00%). Significant causes include inadequate design information, poor project management, and unforeseen challenges like land acquisition disputes. These causes were ranked using the Relative Importance Index (RII) to prioritize their impacts on project time extensions. The authors believe that present findings illuminate the need for improved design and planning processes, along with adaptive project management practices to mitigate EoT claims and enhance project performance within the municipality.

Authors

Institutions

Publication Details

Journal
Kathford Journal of Engineering and Management
Published
2025-02-06
DOI
https://doi.org/10.3126/kjem.v4i1.74707
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Causes for Extension of Time in Construction Projects: A Case Study of Kageshwori Manohara Municipality

Sunil Nepal, Subash Kumar Bhattarai, Sujan Nepal, Dinesh Sukamani
Kathford Journal of Engineering and Management
Construction Project Management and Performance
article

Analysis of Causes for Extension of Time in Construction Projects: A Case Study of Kageshwori Manohara Municipality

Sunil Nepal, Subash Kumar Bhattarai, Sujan Nepal, Dinesh Sukamani
article en

Abstract

Extension of Time (EoT) claims are a common occurrence in construction projects worldwide, often leading to disputes due to insufficient attention to delay causes during the contract initiation phase. However, in the context of Kageshwori Manohara Municipality, these challenges are particularly pronounced due to localized factors. This study identifies key causes of EoT through qualitative and quantitative analyses, utilizing Principal Component Analysis (PCA), Kaiser-Meyer-Olkin (KMO) testing, Bartlett's Test of Sphericity, Eigenvalue and variance analysis, and reliability assessments using Cronbach's Alpha. Principal Component Analysis (PCA) helped to categorize twelve major EoT causes into three components: Design and Consultant-Related Issues (Eigenvalue: 13.892, Variance: 55.57%), Project Management and Execution Challenges (Eigenvalue: 1.146, Variance: 4.58%), and External and Unforeseen Conditions (Eigenvalue: 1.000, Variance: 4.00%). Significant causes include inadequate design information, poor project management, and unforeseen challenges like land acquisition disputes. These causes were ranked using the Relative Importance Index (RII) to prioritize their impacts on project time extensions. The authors believe that present findings illuminate the need for improved design and planning processes, along with adaptive project management practices to mitigate EoT claims and enhance project performance within the municipality.

Kathford Journal of Engineering and ManagementVol. 4(1)
Pokhara University (NP), Grande International Hospital (NP)
Openalex Percentile: Top 98%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Causes for Extension of Time in Construction Projects: A Case Study of Kageshwori Manohara Municipality — Sunil Nepal, Subash Kumar Bhattarai, et al. · Kathford Journal of Engineering and Management (2025) | TGRS Research Map | TGRS