Gray relational analysis and SBOA-BP for predicting settlement intervals of high-speed railway subgrade

Purpose The deformation of the roadbed is easily influenced by the external environment to improve the accuracy of high-speed railway subgrade settlement prediction. Design/methodology/approach A high-speed railway subgrade settlement interval prediction method using the secretary bird optimization (SBOA) algorithm to optimize the BP neural network under the premise of gray relational analysis is proposed. Findings Using the SBOA algorithm to optimize the BP neural network, the optimal weights and thresholds are obtained, and the best parameter prediction model is combined. The data were collected from the sensors deployed through the subgrade settlement monitoring system, and the gray relational analysis is used to verify that all four influencing factors had a great correlation to the subgrade settlement, and the collected data are verified using the model. Originality/value The experimental results show that the SBOA-BP model has higher prediction accuracy than the BP model, and the SBOA-BP model has a wider range of prediction intervals for a given confidence level, which can provide higher guiding value for practical engineering applications.

Authors

Institutions

Publication Details

Journal
Railway Sciences
Published
2025-02-05
DOI
https://doi.org/10.1108/rs-09-2024-0035
Citations
1
Primary Topic
Remote Sensing and Land Use
Type
article
Field-Weighted Citation Impact
1.30
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Gray relational analysis and SBOA-BP for predicting settlement intervals of high-speed railway subgrade

Shaoyuan Li, Qiang He
1 citations
Railway Sciences
Remote Sensing and Land Use
1.30
article

Gray relational analysis and SBOA-BP for predicting settlement intervals of high-speed railway subgrade

Shaoyuan Li, Qiang He
article en
1 citations

Abstract

Purpose The deformation of the roadbed is easily influenced by the external environment to improve the accuracy of high-speed railway subgrade settlement prediction. Design/methodology/approach A high-speed railway subgrade settlement interval prediction method using the secretary bird optimization (SBOA) algorithm to optimize the BP neural network under the premise of gray relational analysis is proposed. Findings Using the SBOA algorithm to optimize the BP neural network, the optimal weights and thresholds are obtained, and the best parameter prediction model is combined. The data were collected from the sensors deployed through the subgrade settlement monitoring system, and the gray relational analysis is used to verify that all four influencing factors had a great correlation to the subgrade settlement, and the collected data are verified using the model. Originality/value The experimental results show that the SBOA-BP model has higher prediction accuracy than the BP model, and the SBOA-BP model has a wider range of prediction intervals for a given confidence level, which can provide higher guiding value for practical engineering applications.

Railway SciencesVol. 4(2)
Shanghai Jiao Tong University (CN), Lanzhou Jiaotong University (CN)
Openalex Percentile: Top 27%
Remote Sensing and Land Use
1.30
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Gray relational analysis and SBOA-BP for predicting settlement intervals of high-speed railway subgrade — Shaoyuan Li, Qiang He · Railway Sciences (2025) | TGRS Research Map | TGRS