Early stage cost prediction model for Indian building construction projects using artificial neural networks

Purpose This paper aims to enhance early-stage cost estimation in construction projects, a critical factor in project feasibility, funding, resource allocation and scheduling. Traditional cost estimation approaches suffer from limitations such as the absence of structured methodologies, assumptions of linear cost relationships, prolonged processes and expert judgment variations. To address these challenges, this study proposes a reliable cost prediction model based on artificial neural networks (ANNs) for building construction projects in India. Design/methodology/approach To develop cost prediction model, this study collected data from 377 building construction projects in India, encompassing 17 essential cost parameters. The methodology involves data preprocessing, constructing features and fine-tuning ANN hyperparameters meticulously to achieve optimal performance. Findings The research showcases effectiveness of cost prediction model, evident in significantly reduced mean square error values. ANN-based prediction model excels in handling nonlinear cost dependencies and diverse project complexities, making it a valuable tool for early-stage cost estimation. Research limitations/implications ANN-based cost prediction model is primarily designed for predicting costs associated with structural works of building projects. Practical implications The proposed solution offers stakeholders a robust data-driven decision-making tool during initial phases of construction projects. This can lead to more successful and economically viable outcomes. Originality/value This research examines the drawbacks of traditional cost estimation methods by presenting a data-driven approach leveraging machine learning. It significantly improves precision of early cost forecasts in construction projects while offering practical value to industry.

Authors

Institutions

Publication Details

Journal
Journal of Financial Management of Property and Construction
Published
2025-02-05
DOI
https://doi.org/10.1108/jfmpc-12-2023-0085
Citations
2
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
1.91
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Early stage cost prediction model for Indian building construction projects using artificial neural networks

S. P. Sreenivas Padala, Anshul Goyal
2 citations
Journal of Financial Management of Property and Construction
Infrastructure Maintenance and Monitoring
1.91
article

Early stage cost prediction model for Indian building construction projects using artificial neural networks

S. P. Sreenivas Padala, Anshul Goyal
article en
2 citations

Abstract

Purpose This paper aims to enhance early-stage cost estimation in construction projects, a critical factor in project feasibility, funding, resource allocation and scheduling. Traditional cost estimation approaches suffer from limitations such as the absence of structured methodologies, assumptions of linear cost relationships, prolonged processes and expert judgment variations. To address these challenges, this study proposes a reliable cost prediction model based on artificial neural networks (ANNs) for building construction projects in India. Design/methodology/approach To develop cost prediction model, this study collected data from 377 building construction projects in India, encompassing 17 essential cost parameters. The methodology involves data preprocessing, constructing features and fine-tuning ANN hyperparameters meticulously to achieve optimal performance. Findings The research showcases effectiveness of cost prediction model, evident in significantly reduced mean square error values. ANN-based prediction model excels in handling nonlinear cost dependencies and diverse project complexities, making it a valuable tool for early-stage cost estimation. Research limitations/implications ANN-based cost prediction model is primarily designed for predicting costs associated with structural works of building projects. Practical implications The proposed solution offers stakeholders a robust data-driven decision-making tool during initial phases of construction projects. This can lead to more successful and economically viable outcomes. Originality/value This research examines the drawbacks of traditional cost estimation methods by presenting a data-driven approach leveraging machine learning. It significantly improves precision of early cost forecasts in construction projects while offering practical value to industry.

Journal of Financial Management of Property and ConstructionVol. 30(3)
M S Ramaiah University of Applied Sciences (IN), Larsen & Toubro (India) (IN)
Openalex Percentile: Top 18%
Infrastructure Maintenance and Monitoring
1.91
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.