Impact of time-based variability on planning reliability in construction projects: analysis of production management systems

Purpose This research article proposes a quantitative method for analyzing planning reliability and risk evaluation in construction projects through probabilistic numerical simulation models. The aim is to assess the combined time-based variability of activities across the project and its impact on planning reliability in various production management systems. Design/methodology/approach The study examines different methods for comparing the impact of production management strategies, specifically standardization and lean construction practices, on project reliability. The article introduces Monte Carlo, importance sampling and first-order-second moment methods as quantitative tools for decision-making and continuous improvement in construction projects. Findings The utilization of multiple numerical simulation models demonstrates how the variability in activity durations directly affects planning reliability, leading to uncertainty and increased risk in construction projects. The study highlights the significance of lean construction principles and industrialized processes, such as standardization of processes and construction methods, in reducing variability and improving the average duration of activities. Furthermore, it quantifies the differential impact of various production management systems on project performance and planning reliability. Research limitations/implications This study is based on a limited number of case studies, which may affect the generalizability of the findings. The results are specific to the construction projects analyzed in Colombia. Expanding the research to include a broader range of projects will improve the applicability of the findings. Developing more comprehensive numerical models can also enhance understanding of planning reliability across different construction management systems. Originality/value Currently, there are limited quantitative methods available for project managers to evaluate the impact of industrialized construction practices and production management strategies on planning reliability as well as quantifying the associated risk level in project delays. Consequently, the adoption of innovative construction methods is often limited to a few pilot projects, as managers lack numerical evidence to support the implementation of new methodologies that require changes in traditional operational practices.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-02-05
DOI
https://doi.org/10.1108/ecam-06-2023-0597
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of time-based variability on planning reliability in construction projects: analysis of production management systems

Nelly P. Garcia-Lopez, José Guevara, William León
1 links
Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Impact of time-based variability on planning reliability in construction projects: analysis of production management systems

Nelly P. Garcia-Lopez, José Guevara, William León
article en

Abstract

Purpose This research article proposes a quantitative method for analyzing planning reliability and risk evaluation in construction projects through probabilistic numerical simulation models. The aim is to assess the combined time-based variability of activities across the project and its impact on planning reliability in various production management systems. Design/methodology/approach The study examines different methods for comparing the impact of production management strategies, specifically standardization and lean construction practices, on project reliability. The article introduces Monte Carlo, importance sampling and first-order-second moment methods as quantitative tools for decision-making and continuous improvement in construction projects. Findings The utilization of multiple numerical simulation models demonstrates how the variability in activity durations directly affects planning reliability, leading to uncertainty and increased risk in construction projects. The study highlights the significance of lean construction principles and industrialized processes, such as standardization of processes and construction methods, in reducing variability and improving the average duration of activities. Furthermore, it quantifies the differential impact of various production management systems on project performance and planning reliability. Research limitations/implications This study is based on a limited number of case studies, which may affect the generalizability of the findings. The results are specific to the construction projects analyzed in Colombia. Expanding the research to include a broader range of projects will improve the applicability of the findings. Developing more comprehensive numerical models can also enhance understanding of planning reliability across different construction management systems. Originality/value Currently, there are limited quantitative methods available for project managers to evaluate the impact of industrialized construction practices and production management strategies on planning reliability as well as quantifying the associated risk level in project delays. Consequently, the adoption of innovative construction methods is often limited to a few pilot projects, as managers lack numerical evidence to support the implementation of new methodologies that require changes in traditional operational practices.

Engineering Construction & Architectural Management
Universidad de Los Andes (CO)
Openalex Percentile: Top 98%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.