Study on the Optimization of Implementation Time for the Construction of the Baraka Sports Facility Center (APBD PEN) Kab. Enrekang South Sulawesi

In some projects, there are often delays in the completion of work, especially during construction work. To reduce the occurrence of cost overruns, it is necessary to optimize work time that is more carefully planned so that work delays can be avoided. In the field of construction engineering, the Microsoft Project application is used to manage plans or task times so that an ongoing project can be evaluated according to all stages of tasks in the project. The implementation of the Baraka Sports Facilities Center Development Project in June to July 2022 shows the time or duration of the planned implementation of the roof work for 37 calendar days and after analyzing the data using Microsoft Project, the optimization time is 32 calendar days. For 32 days, by increasing the number of workers, the following adjustments were made to improve efficiency: a. For SCH 20, 4” pipework, 3 welders and 3 additional workers were added; b. For batten work with CNP 150.50.20.2, 3 craftsmen and 3 additional workers were added; c. For bitumen asphalt roof covering work (CTI), 7 workers and 7 handymen were added; d. For bitumen asphalt work, 1 worker and 1 handyman were added.

Authors

Institutions

Publication Details

Journal
Civilla Jurnal Teknik Sipil Universitas Islam Lamongan
Published
2024-09-02
DOI
https://doi.org/10.30736/cvl.v9i2.1206
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on the Optimization of Implementation Time for the Construction of the Baraka Sports Facility Center (APBD PEN) Kab. Enrekang South Sulawesi

Fitriah, Mahyuddin Mahyuddin, Fatmawaty Rachim, Erdawaty Erdawaty
Civilla Jurnal Teknik Sipil Universitas Islam Lamongan
BIM and Construction Integration
article

Study on the Optimization of Implementation Time for the Construction of the Baraka Sports Facility Center (APBD PEN) Kab. Enrekang South Sulawesi

Fitriah, Mahyuddin Mahyuddin, Fatmawaty Rachim, Erdawaty Erdawaty
article en

Abstract

In some projects, there are often delays in the completion of work, especially during construction work. To reduce the occurrence of cost overruns, it is necessary to optimize work time that is more carefully planned so that work delays can be avoided. In the field of construction engineering, the Microsoft Project application is used to manage plans or task times so that an ongoing project can be evaluated according to all stages of tasks in the project. The implementation of the Baraka Sports Facilities Center Development Project in June to July 2022 shows the time or duration of the planned implementation of the roof work for 37 calendar days and after analyzing the data using Microsoft Project, the optimization time is 32 calendar days. For 32 days, by increasing the number of workers, the following adjustments were made to improve efficiency: a. For SCH 20, 4” pipework, 3 welders and 3 additional workers were added; b. For batten work with CNP 150.50.20.2, 3 craftsmen and 3 additional workers were added; c. For bitumen asphalt roof covering work (CTI), 7 workers and 7 handymen were added; d. For bitumen asphalt work, 1 worker and 1 handyman were added.

Civilla Jurnal Teknik Sipil Universitas Islam LamonganVol. 9(2)
Islamic University of Indonesia (ID), Universitas Fajar (ID)
Openalex Percentile: Top 71%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Study on the Optimization of Implementation Time for the Construction of the Baraka Sports Facility Center (APBD PEN) Kab. Enrekang South Sulawesi — Fitriah, Mahyuddin Mahyuddin, et al. · Civilla Jurnal Teknik Sipil Universitas Islam Lamongan (2024) | TGRS Research Map | TGRS