Analysis and Suppression for Temporary Overvoltage Considering Dynamic Interactions Between LCC-HVDC and Renewable Energy Plants

Temporary overvoltage (TOV) severely restricts the development and utilization of renewable power resources (RPRs), especially when RPRs are delivered through the line commutated converter-based high voltage direct current (LCC-HVDC) system. To reveal the TOV mechanism for the sending system during commutation failures (CFs), the transient process of the system is partitioned into different stages, where the evolution of the system trajectories is analyzed. On this basis, the variation of AC voltage and DC current considering complex dynamic interactions between LCC-HVDC and renewable energy Plants (REPs) during repetitive CFs (RCFs) is clearly quantified. After revealing the impact of control parameters of both REPs and the LCC-HVDC on the TOV during RCFs, a collaborative optimization method for control parameters is proposed for TOV suppression. Moreover, when the blocking after the RCF tends to be inevitable, the optimal blocking moment is determined to inhibit the TOV caused by HVDC blocking. The accuracy and effectiveness of the proposed methods are verified with EMT simulations of a typical benchmark system.

Authors

Institutions

Publication Details

Journal
IEEE Transactions on Sustainable Energy
Published
2025-02-05
DOI
https://doi.org/10.1109/tste.2025.3538682
Citations
10
Primary Topic
HVDC Systems and Fault Protection
Type
article
Field-Weighted Citation Impact
7.30
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis and Suppression for Temporary Overvoltage Considering Dynamic Interactions Between LCC-HVDC and Renewable Energy Plants

Jung‐Yen Huang, Xinyu Liu, Di Zheng, Tianshu Bi et al.
10 citations
IEEE Transactions on Sustainable Energy
HVDC Systems and Fault Protection
7.30
article

Analysis and Suppression for Temporary Overvoltage Considering Dynamic Interactions Between LCC-HVDC and Renewable Energy Plants

Jung‐Yen Huang, Xinyu Liu, Di Zheng, Tianshu Bi, Huanhai Xin
article en
10 citations

Abstract

Temporary overvoltage (TOV) severely restricts the development and utilization of renewable power resources (RPRs), especially when RPRs are delivered through the line commutated converter-based high voltage direct current (LCC-HVDC) system. To reveal the TOV mechanism for the sending system during commutation failures (CFs), the transient process of the system is partitioned into different stages, where the evolution of the system trajectories is analyzed. On this basis, the variation of AC voltage and DC current considering complex dynamic interactions between LCC-HVDC and renewable energy Plants (REPs) during repetitive CFs (RCFs) is clearly quantified. After revealing the impact of control parameters of both REPs and the LCC-HVDC on the TOV during RCFs, a collaborative optimization method for control parameters is proposed for TOV suppression. Moreover, when the blocking after the RCF tends to be inevitable, the optimal blocking moment is determined to inhibit the TOV caused by HVDC blocking. The accuracy and effectiveness of the proposed methods are verified with EMT simulations of a typical benchmark system.

IEEE Transactions on Sustainable EnergyVol. 16(3)
North China Electric Power University (CN), China Jiliang University (CN), Zhejiang University (CN)
Affordable and clean energy
Openalex Percentile: Top 3%
HVDC Systems and Fault Protection
7.30
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.