The impact of BIM on project time and cost: insights from case studies

Building Information Modelling (BIM) has emerged as a transformative tool in the Architecture, Engineering, and Construction (AEC) industries, offering significant potential to improve project efficiency and outcomes. This study explores the impact of BIM implementation on project time and cost by analyzing critical factors such as design errors, unbudgeted changes, Requests for Information (RFIs), labour dynamics, and scheduling across multiple case studies. Quantitative results reveal that BIM adoption reduces project timelines by an average of 20% and costs by 15%, while also decreasing design errors by 30% and RFIs by 25%. Furthermore, BIM enhances collaboration among stakeholders, improves design visualization, and facilitates better risk assessment, leading to more informed decision-making throughout the project lifecycle. These findings are synthesized into a decision-making framework that estimates the probability of errors, evaluates their potential time and cost implications, and ensures alignment with project budgets. The framework serves as a strategic guide for project teams to assess the suitability of BIM for specific projects, thereby optimizing decision-making processes and improving overall project performance. Additionally, the study examines the role of BIM in sustainability by reducing material waste and improving resource allocation. This study addresses a critical gap in the field by systematically evaluating the interrelationships among BIM's impacts on key project parameters, which have often been treated in isolation in prior research. The importance of this work lies in its provision of a structured methodology to harness BIM's capabilities, demonstrating its value in delivering significant time and cost efficiencies while enhancing project quality. By integrating empirical analysis with practical applications, this research contributes to the growing body of knowledge on BIM adoption and provides actionable insights for AEC professionals seeking to optimize project outcomes.

Authors

Institutions

Publication Details

Journal
Discover Materials
Published
2025-02-05
DOI
https://doi.org/10.1007/s43939-025-00200-2
Citations
24
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
24.15
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The impact of BIM on project time and cost: insights from case studies

Salman Khursheed, Virendra Kumar Paul, Karan Das
24 citations
Discover Materials
BIM and Construction Integration
24.15
article

The impact of BIM on project time and cost: insights from case studies

Salman Khursheed, Virendra Kumar Paul, Karan Das
article en
24 citations

Abstract

Building Information Modelling (BIM) has emerged as a transformative tool in the Architecture, Engineering, and Construction (AEC) industries, offering significant potential to improve project efficiency and outcomes. This study explores the impact of BIM implementation on project time and cost by analyzing critical factors such as design errors, unbudgeted changes, Requests for Information (RFIs), labour dynamics, and scheduling across multiple case studies. Quantitative results reveal that BIM adoption reduces project timelines by an average of 20% and costs by 15%, while also decreasing design errors by 30% and RFIs by 25%. Furthermore, BIM enhances collaboration among stakeholders, improves design visualization, and facilitates better risk assessment, leading to more informed decision-making throughout the project lifecycle. These findings are synthesized into a decision-making framework that estimates the probability of errors, evaluates their potential time and cost implications, and ensures alignment with project budgets. The framework serves as a strategic guide for project teams to assess the suitability of BIM for specific projects, thereby optimizing decision-making processes and improving overall project performance. Additionally, the study examines the role of BIM in sustainability by reducing material waste and improving resource allocation. This study addresses a critical gap in the field by systematically evaluating the interrelationships among BIM's impacts on key project parameters, which have often been treated in isolation in prior research. The importance of this work lies in its provision of a structured methodology to harness BIM's capabilities, demonstrating its value in delivering significant time and cost efficiencies while enhancing project quality. By integrating empirical analysis with practical applications, this research contributes to the growing body of knowledge on BIM adoption and provides actionable insights for AEC professionals seeking to optimize project outcomes.

Discover MaterialsVol. 5(1)
School of Planning and Architecture Delhi (IN)
Openalex Percentile: Top 0%
BIM and Construction Integration
24.15
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.