Identifikasi Waste pada detail Aktivitas Pekerjaan Pembesian

Waste frequently occurs in construction projects, encompassing both material and non-material waste. This study aims to analyze the waste generated during rebar work, specifically focusing on the detailed activities of measuring and cutting rebar, using the Value Stream Mapping (VSM) approach. The research was conducted at a rebar fabrication facility for a 14-story high-rise building project in Surabaya. VSM was employed to visualize work processes by identifying specific activities in rebar operations, allowing for precise identification of waste. Primary data were collected through direct field observations, while secondary data were obtained from project documents.The findings revealed 11 detailed activities in the measuring process and another 11 in the cutting process. Among these activities, the largest types of waste identified were waiting (10 points), unnecessary motion (6 points), and defects (3 points), totaling 22 waste-related activities. Identifying waste-generating activities and their types in construction work facilitates improved work process efficiency, reduced operational costs, and optimized resource utilization. Furthermore, this also supports enhanced productivity, better work quality, and environmental sustainability by minimizing construction waste.

Authors

Institutions

Publication Details

Journal
Ranah Research Journal of Multidisciplinary Research and Development
Published
2025-02-04
DOI
https://doi.org/10.38035/rrj.v7i3.1494
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identifikasi Waste pada detail Aktivitas Pekerjaan Pembesian

Angelina Dwini Teras, Farida Rachmawati
Ranah Research Journal of Multidisciplinary Research and Development
Management and Optimization Techniques
article

Identifikasi Waste pada detail Aktivitas Pekerjaan Pembesian

Angelina Dwini Teras, Farida Rachmawati
article en

Abstract

Waste frequently occurs in construction projects, encompassing both material and non-material waste. This study aims to analyze the waste generated during rebar work, specifically focusing on the detailed activities of measuring and cutting rebar, using the Value Stream Mapping (VSM) approach. The research was conducted at a rebar fabrication facility for a 14-story high-rise building project in Surabaya. VSM was employed to visualize work processes by identifying specific activities in rebar operations, allowing for precise identification of waste. Primary data were collected through direct field observations, while secondary data were obtained from project documents.The findings revealed 11 detailed activities in the measuring process and another 11 in the cutting process. Among these activities, the largest types of waste identified were waiting (10 points), unnecessary motion (6 points), and defects (3 points), totaling 22 waste-related activities. Identifying waste-generating activities and their types in construction work facilitates improved work process efficiency, reduced operational costs, and optimized resource utilization. Furthermore, this also supports enhanced productivity, better work quality, and environmental sustainability by minimizing construction waste.

Ranah Research Journal of Multidisciplinary Research and DevelopmentVol. 7(3)
Sepuluh Nopember Institute of Technology (ID)
Openalex Percentile: Top 97%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.