Lean Production in an Aerospace Parts Manufacturing Factory: A Case Study

The aerospace parts manufacturing industry is a highly precise sector, facing challenges such as a complex product mix and long production cycle times. Over the past several decades, lean manufacturing methods have been widely applied across various types of production systems. By eliminating the seven wastes and employing methods such as Value Stream Mapping (VSM) and Kanban, significant improvements have been observed in many industries.This research proposed an implementation framework for lean production and applied it to an aerospace parts manufacturer. Given the complexity of the manufacturing process and the prevalent job-shop layout in its production systems, this study designed a process-oriented production process analysis method to implement Value Stream Mapping. From the perspectives of Work-In-Process and Utilization, it iteratively identifies bottlenecks within the production process, aiming for continuous improvement in production throughput and cycle time. Finally, the principles of Factory Physics were applied to analyze production performance.

Authors

Institutions

Publication Details

Published
2024-12-15
DOI
https://doi.org/10.1109/ieem62345.2024.10857143
Citations
1
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.53
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Lean Production in an Aerospace Parts Manufacturing Factory: A Case Study

André Krischke, Fei-Pai Liu, Jun Der Leu
1 citations
Quality and Supply Management
0.53
article

Lean Production in an Aerospace Parts Manufacturing Factory: A Case Study

André Krischke, Fei-Pai Liu, Jun Der Leu
article en
1 citations

Abstract

The aerospace parts manufacturing industry is a highly precise sector, facing challenges such as a complex product mix and long production cycle times. Over the past several decades, lean manufacturing methods have been widely applied across various types of production systems. By eliminating the seven wastes and employing methods such as Value Stream Mapping (VSM) and Kanban, significant improvements have been observed in many industries.This research proposed an implementation framework for lean production and applied it to an aerospace parts manufacturer. Given the complexity of the manufacturing process and the prevalent job-shop layout in its production systems, this study designed a process-oriented production process analysis method to implement Value Stream Mapping. From the perspectives of Work-In-Process and Utilization, it iteratively identifies bottlenecks within the production process, aiming for continuous improvement in production throughput and cycle time. Finally, the principles of Factory Physics were applied to analyze production performance.

Munich University of Applied Sciences (DE), National Central University (TW)
Openalex Percentile: Top 22%
Quality and Supply Management
0.53
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.