A comprehensive analysis of time investment in skid trail planning for forest access

Properly planned skid trails form an important basis for sustainable timber production. They affect cost-effectiveness and the environmental impact of the harvesting process to a large extent. Here, we conducted an economic analysis to understand the skid trail planning process and to generate an initial model to estimate the time and costs involved. We investigated in detail how the planning process of skid trails is carried out in practice, what time is required for the planning work, and what factors influence its performance. Through an online survey conducted in 2022, we asked practitioners in Germany and Switzerland about their time and effort required for the planning process and the determining factors, such as the planning method and the terrain and stand conditions. Based on this survey, we calculated statistical indicators of time consumption, considered possible rationalization options, and developed an initial estimation model. The effort required to identify and evaluate skid trails planned for distances of 20 to 40 m amounts to around 3 to 4 hours of productive working time per hectare, with deviations expected depending on the specific situation in the forest. The costs corresponding to this investment amount to less than one euro per cubic meter of harvested timber, depending primarily on the extent of wood use. Our in-depth insight into the planning process enables its economic evaluation and the development of improvements.

Authors

Institutions

Publication Details

Journal
PLoS ONE
Published
2025-02-04
DOI
https://doi.org/10.1371/journal.pone.0317963
Citations
6
Primary Topic
Forest Biomass Utilization and Management
Type
article
Field-Weighted Citation Impact
5.18

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A comprehensive analysis of time investment in skid trail planning for forest access

Leo Bont, Marc Werder, Oliver Thees, Janine Schweier
6 citations
PLoS ONE
Forest Biomass Utilization and Management
5.18
article

A comprehensive analysis of time investment in skid trail planning for forest access

Leo Bont, Marc Werder, Oliver Thees, Janine Schweier
article en
6 citations

Abstract

Properly planned skid trails form an important basis for sustainable timber production. They affect cost-effectiveness and the environmental impact of the harvesting process to a large extent. Here, we conducted an economic analysis to understand the skid trail planning process and to generate an initial model to estimate the time and costs involved. We investigated in detail how the planning process of skid trails is carried out in practice, what time is required for the planning work, and what factors influence its performance. Through an online survey conducted in 2022, we asked practitioners in Germany and Switzerland about their time and effort required for the planning process and the determining factors, such as the planning method and the terrain and stand conditions. Based on this survey, we calculated statistical indicators of time consumption, considered possible rationalization options, and developed an initial estimation model. The effort required to identify and evaluate skid trails planned for distances of 20 to 40 m amounts to around 3 to 4 hours of productive working time per hectare, with deviations expected depending on the specific situation in the forest. The costs corresponding to this investment amount to less than one euro per cubic meter of harvested timber, depending primarily on the extent of wood use. Our in-depth insight into the planning process enables its economic evaluation and the development of improvements.

PLoS ONEVol. 20(2)
Swiss Federal Institute for Forest, Snow and Landscape Research (CH)
Bundesamt für Umwelt
Responsible consumption and production
Openalex Percentile: Top 5%
Forest Biomass Utilization and Management
5.18
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A comprehensive analysis of time investment in skid trail planning for forest access — Leo Bont, Marc Werder, et al. · PLoS ONE (2025) | TGRS Research Map | TGRS