Risk analysis of mechanical cross-passage construction using work breakdown and fault tree

A subway cross-passage is a connecting aisle between main tunnels. Owing to its narrow construction site, it is difficult to implement safety measures, and intensive construction techniques are often required. With the development of technology, the mechanical cross-passage technology has emerged. In order to address the risk problem of mechanical cross-passage construction, the construction process was systematically decomposed based on the work breakdown structure, and a fault tree of each construction process was established for qualitative analysis. Various factors leading to construction risks have been identified, such as head sinking of the excavation machine, spiral machine gushing, excavation deviation from axis, excavation surface soil instability, and ground deformation, and corresponding risk response measures have been proposed. The targeted measures were applied to the mechanical construction of Qingdao Subway Line 8, and the successful completion of the cross-passage verified the applicability of the risk analysis and the effectiveness of the response measures.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Forensic Engineering
Published
2025-02-04
DOI
https://doi.org/10.1680/jfoen.24.00008
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk analysis of mechanical cross-passage construction using work breakdown and fault tree

Yuan Gao, Zheyong Wang, Shilin Zhang, Yaping Zhao
Proceedings of the Institution of Civil Engineers - Forensic Engineering
Risk and Safety Analysis
article

Risk analysis of mechanical cross-passage construction using work breakdown and fault tree

Yuan Gao, Zheyong Wang, Shilin Zhang, Yaping Zhao
article en

Abstract

A subway cross-passage is a connecting aisle between main tunnels. Owing to its narrow construction site, it is difficult to implement safety measures, and intensive construction techniques are often required. With the development of technology, the mechanical cross-passage technology has emerged. In order to address the risk problem of mechanical cross-passage construction, the construction process was systematically decomposed based on the work breakdown structure, and a fault tree of each construction process was established for qualitative analysis. Various factors leading to construction risks have been identified, such as head sinking of the excavation machine, spiral machine gushing, excavation deviation from axis, excavation surface soil instability, and ground deformation, and corresponding risk response measures have been proposed. The targeted measures were applied to the mechanical construction of Qingdao Subway Line 8, and the successful completion of the cross-passage verified the applicability of the risk analysis and the effectiveness of the response measures.

Proceedings of the Institution of Civil Engineers - Forensic EngineeringVol. 178(1-2)
Guangzhou Metro Group (China) (CN), Qingdao Center of Resource Chemistry and New Materials (CN)
Openalex Percentile: Top 98%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.