Study on Deformation Control during Shield Tunnel Construction Beneath Existing Tunnels

This study is based on the background that the tunnel of Ningbo Metro Line 8 passes beneath the tunnel of Line 1. A three-dimensional numerical model was developed using Midas to simulate the deformation induced by the construction of the new Line 8 tunnel beneath the existing Line 1 tunnel. The results show that the maximum lateral horizontal deformation, longitudinal horizontal deformation, and vertical deformation of the Line 1 tunnel occur after the excavation of the Line 8 tunnel is completed. Notably, all deformations comply with the settlement control standards for existing tunnels in urban rail transit systems in China. After the excavation of the Line 8 tunnel is completed, the maximum surface settlement is less than the settlement control value, indicating that the excavation of Line 8 tunnel has less additional impact on the Line 1 tunnel. It is recommended that, during the construction of the new tunnel, intensive monitoring of the existing tunnel is implemented, particularly focusing on settlement in the central section, to mitigate the risk of structural damage due to excessive deformation.

Authors

Institutions

Publication Details

Journal
International Journal of Robotics and Automation Technology
Published
2025-02-03
DOI
https://doi.org/10.31875/2409-9694.2025.12.01
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on Deformation Control during Shield Tunnel Construction Beneath Existing Tunnels

Pingchuan Lai, Linlong Mu, Kai Yan
International Journal of Robotics and Automation Technology
Civil and Geotechnical Engineering Research
article

Study on Deformation Control during Shield Tunnel Construction Beneath Existing Tunnels

Pingchuan Lai, Linlong Mu, Kai Yan
article en

Abstract

This study is based on the background that the tunnel of Ningbo Metro Line 8 passes beneath the tunnel of Line 1. A three-dimensional numerical model was developed using Midas to simulate the deformation induced by the construction of the new Line 8 tunnel beneath the existing Line 1 tunnel. The results show that the maximum lateral horizontal deformation, longitudinal horizontal deformation, and vertical deformation of the Line 1 tunnel occur after the excavation of the Line 8 tunnel is completed. Notably, all deformations comply with the settlement control standards for existing tunnels in urban rail transit systems in China. After the excavation of the Line 8 tunnel is completed, the maximum surface settlement is less than the settlement control value, indicating that the excavation of Line 8 tunnel has less additional impact on the Line 1 tunnel. It is recommended that, during the construction of the new tunnel, intensive monitoring of the existing tunnel is implemented, particularly focusing on settlement in the central section, to mitigate the risk of structural damage due to excessive deformation.

International Journal of Robotics and Automation TechnologyVol. 12
Tongji University (CN)
Openalex Percentile: Top 95%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.