Evaluation of The Implementation of Quality Management, Costs and Time in The Process of Self-Managed Project Development (Study on House Building Projects Muhammadiyah University Semarang Hospital)

The construction of Universitas Muhammadiyah Semarang (Unimus) Hospital employs a self-management approach. During the construction phase, delays and a decline in building quality that did not align with the planning phase were observed. Therefore, a review of the management approach is necessary to ensure timely completion, maintained quality, and cost efficiency. This study evaluates the effectiveness of time, cost, and quality management in the construction project. The analysis method used is the interactive data analysis paradigm, involving data reduction, storage, and analysis using IBM SPSS 20. The analysis results indicate that time and cost management have been effective, with the construction work being completed within the set schedule and the costs not exceeding the Budget Plan. Quality management is rated very good with a score of 4.35, indicating that the construction process is strictly carried out according to specified materials and work procedures. Cost savings are also rated very good with a score of 3.89, indicating effective cost control. Time efficiency is rated good with a score of 4.06, showing that the project can run the schedule efficiently. Based on the research results, the researcher recommends enhancing leadership aspects and increasing active involvement of top management in supervision and strategic decision-making. This study also shows that self-management can promote transparency, efficiency, and high-quality outcomes in construction projects.

Authors

Institutions

Publication Details

Journal
Journal of Advanced Civil and Environmental Engineering
Published
2024-12-31
DOI
https://doi.org/10.30659/jacee.7.2.184-198
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of The Implementation of Quality Management, Costs and Time in The Process of Self-Managed Project Development (Study on House Building Projects Muhammadiyah University Semarang Hospital)

Kartono Wibowo, Henny Pratiwi Adi, M Martomo
Journal of Advanced Civil and Environmental Engineering
Construction Project Management and Performance
article

Evaluation of The Implementation of Quality Management, Costs and Time in The Process of Self-Managed Project Development (Study on House Building Projects Muhammadiyah University Semarang Hospital)

Kartono Wibowo, Henny Pratiwi Adi, M Martomo
article en

Abstract

The construction of Universitas Muhammadiyah Semarang (Unimus) Hospital employs a self-management approach. During the construction phase, delays and a decline in building quality that did not align with the planning phase were observed. Therefore, a review of the management approach is necessary to ensure timely completion, maintained quality, and cost efficiency. This study evaluates the effectiveness of time, cost, and quality management in the construction project. The analysis method used is the interactive data analysis paradigm, involving data reduction, storage, and analysis using IBM SPSS 20. The analysis results indicate that time and cost management have been effective, with the construction work being completed within the set schedule and the costs not exceeding the Budget Plan. Quality management is rated very good with a score of 4.35, indicating that the construction process is strictly carried out according to specified materials and work procedures. Cost savings are also rated very good with a score of 3.89, indicating effective cost control. Time efficiency is rated good with a score of 4.06, showing that the project can run the schedule efficiently. Based on the research results, the researcher recommends enhancing leadership aspects and increasing active involvement of top management in supervision and strategic decision-making. This study also shows that self-management can promote transparency, efficiency, and high-quality outcomes in construction projects.

Journal of Advanced Civil and Environmental EngineeringVol. 7(2)
Sultan Agung Islamic University (ID)
Openalex Percentile: Top 67%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of The Implementation of Quality Management, Costs and Time in The Process of Self-Managed Project Development (Study on House Building Projects Muhammadiyah University Semarang Hospital) — Kartono Wibowo, Henny Pratiwi Adi, et al. · Journal of Advanced Civil and Environmental Engineering (2024) | TGRS Research Map | TGRS