Evaluating the upgrade potential of Uganda’s 132 kV transmission lines to 220 kV: Nkenda to Mbarara South as a case Study

This study examines the feasibility of upgrading Uganda’s 132 kV transmission lines to 220 kV, using the Nkenda to Mbarara South line as a case study. The primary focus is to mitigate power losses, improve system efficiency, and enhance voltage regulation. The research employs the Nominal Pi-model in MATLAB to verify line parameters, evaluate performance indicators (efficiency, power factor, and voltage regulation), and assess economic viability through a Net Present Value (NPV) analysis. Findings reveal that the upgrade would reduce power losses by 68%, increase efficiency to 98.77%, and lower voltage regulation by 7.69%. The study concludes that the upgrade is both technically and economically viable, offering long-term benefits to Uganda’s energy infrastructure. Recommendations include the immediate implementation of the 220 kV upgrade and the development of policies to optimize transmission system investments.

Authors

Publication Details

Journal
KIU journal of science engineering and technology
Published
2024-12-30
DOI
https://doi.org/10.59568/kjset-2024-3-2-07
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating the upgrade potential of Uganda’s 132 kV transmission lines to 220 kV: Nkenda to Mbarara South as a case Study

Emmanuel Ogwal, Grace Charles Mwanja, Shuaibu Aliyu Nuhu, Guntreddi Venkataramana
KIU journal of science engineering and technology
Power System Reliability and Maintenance
article

Evaluating the upgrade potential of Uganda’s 132 kV transmission lines to 220 kV: Nkenda to Mbarara South as a case Study

Emmanuel Ogwal, Grace Charles Mwanja, Shuaibu Aliyu Nuhu, Guntreddi Venkataramana
article en

Abstract

This study examines the feasibility of upgrading Uganda’s 132 kV transmission lines to 220 kV, using the Nkenda to Mbarara South line as a case study. The primary focus is to mitigate power losses, improve system efficiency, and enhance voltage regulation. The research employs the Nominal Pi-model in MATLAB to verify line parameters, evaluate performance indicators (efficiency, power factor, and voltage regulation), and assess economic viability through a Net Present Value (NPV) analysis. Findings reveal that the upgrade would reduce power losses by 68%, increase efficiency to 98.77%, and lower voltage regulation by 7.69%. The study concludes that the upgrade is both technically and economically viable, offering long-term benefits to Uganda’s energy infrastructure. Recommendations include the immediate implementation of the 220 kV upgrade and the development of policies to optimize transmission system investments.

KIU journal of science engineering and technology
Openalex Percentile: Top 67%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.