Reducing an Indonesian Auto Part Production Cycle Time using the PDCA Approach: A Case Study

Constituting the biggest challenge in any manufacturing company’s product delivery, operational excellence can be accomplished by obtaining the best Quality, Cost, and Delivery (QCD). The delivery parameter has been an issue for the ABC Company, an Indonesian auto part manufacturer, having automotive manufacturers as customers, since its cycle time has been found to be lower than its takt time. This could jeopardize the company’s status in that it could degrade its customer service level. Thus, the company immediately initiated a quality control circle, especially when it was revealed that its production cycle time in Core Assy Line 3 was 49 s more than its targeted 41.7 s takt time. The team was then committed to reducing it to 39.2 s, accounting for a 20% reduction. A method named 8 steps and 7 tools was deployed under the Plan-Do-Check-Act (PDCA) approach to solve the specific problem. This method guided the team to find five root causes of the problem, while five solutions were equivalently provided. As a result, the achieved cycle time reduction was from 49 to 38.9 s, that is, a 21% decrease, capable of securing the company’s relationship with its customers and granting an order increase.

Authors

Institutions

Publication Details

Journal
Engineering Technology & Applied Science Research
Published
2025-02-01
DOI
https://doi.org/10.48084/etasr.7712
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reducing an Indonesian Auto Part Production Cycle Time using the PDCA Approach: A Case Study

Jonny Jonny
Engineering Technology & Applied Science Research
Management and Optimization Techniques
article

Reducing an Indonesian Auto Part Production Cycle Time using the PDCA Approach: A Case Study

Jonny Jonny
article en

Abstract

Constituting the biggest challenge in any manufacturing company’s product delivery, operational excellence can be accomplished by obtaining the best Quality, Cost, and Delivery (QCD). The delivery parameter has been an issue for the ABC Company, an Indonesian auto part manufacturer, having automotive manufacturers as customers, since its cycle time has been found to be lower than its takt time. This could jeopardize the company’s status in that it could degrade its customer service level. Thus, the company immediately initiated a quality control circle, especially when it was revealed that its production cycle time in Core Assy Line 3 was 49 s more than its targeted 41.7 s takt time. The team was then committed to reducing it to 39.2 s, accounting for a 20% reduction. A method named 8 steps and 7 tools was deployed under the Plan-Do-Check-Act (PDCA) approach to solve the specific problem. This method guided the team to find five root causes of the problem, while five solutions were equivalently provided. As a result, the achieved cycle time reduction was from 49 to 38.9 s, that is, a 21% decrease, capable of securing the company’s relationship with its customers and granting an order increase.

Engineering Technology & Applied Science ResearchVol. 15(1)
Binus University (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 98%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.