Research on the Time of Fire Initiation Caused by Tree Line Faults Under 35kV Transmission Lines

In recent years, forest fires caused by transmission line tree line faults occur frequently, transmission line tree line faults affect the safety and reliability of power grid operation, a serious threat to the safety of natural resources and people's property. In this paper, for the 35kV transmission line tree line faults caused by hill fire, built a 35kV line tree line fault experimental platform, in the capacitance current of 248 mA and 132 mA conditions, respectively, selected bamboo, pine and cedar three typical trees as a research sample, to carry out the three kinds of trees tree line fault fire time experiments. The burning phenomena, charring channels, and infrared images of different trees were recorded and analyzed, and the corresponding laws were drawn up to summarize the longest and shortest fire starting times of different capacitance currents and different trees. The research in this paper can provide technical reference for the development of measures to prevent fire caused by tree line faults in 35kV transmission lines.

Authors

Institutions

Publication Details

Published
2024-12-13
DOI
https://doi.org/10.1109/icpes63746.2024.10856632
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Time of Fire Initiation Caused by Tree Line Faults Under 35kV Transmission Lines

Zhongdong Wang, Haohan Yang, Tianxiang Chen, Yi Han Zeng
Power Systems and Technologies
article

Research on the Time of Fire Initiation Caused by Tree Line Faults Under 35kV Transmission Lines

Zhongdong Wang, Haohan Yang, Tianxiang Chen, Yi Han Zeng
article en

Abstract

In recent years, forest fires caused by transmission line tree line faults occur frequently, transmission line tree line faults affect the safety and reliability of power grid operation, a serious threat to the safety of natural resources and people's property. In this paper, for the 35kV transmission line tree line faults caused by hill fire, built a 35kV line tree line fault experimental platform, in the capacitance current of 248 mA and 132 mA conditions, respectively, selected bamboo, pine and cedar three typical trees as a research sample, to carry out the three kinds of trees tree line fault fire time experiments. The burning phenomena, charring channels, and infrared images of different trees were recorded and analyzed, and the corresponding laws were drawn up to summarize the longest and shortest fire starting times of different capacitance currents and different trees. The research in this paper can provide technical reference for the development of measures to prevent fire caused by tree line faults in 35kV transmission lines.

Chengdu University of Technology (CN)
Climate action
Openalex Percentile: Top 76%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.