US bets on new lithium extraction technology

The US Department of Energy (DOE) has committed to a $1.4 billion loan for a project that will use an emerging technology to separate lithium from geothermal brines in California. The agency says the loan, to EnergySource Minerals, is an important step toward establishing a battery supply chain in the US. EnergySource plans to build a direct lithium extraction (DLE) plant in Imperial County, near the Salton Sea. At full capacity, the firm hopes to produce 20,000 metric tons (t) of lithium hydroxide per year, enough for about half a million electric car batteries. EnergySource had hoped to start operating the plant this year but now says trial operations are slated for 2026 and full production is expected by the end of 2027. EnergySource will have to meet certain conditions before closing the loan. EnergySource has secured investments from the oil-field services company SLB and from Livent, a lithium producer

Authors

Publication Details

Journal
C&EN Global Enterprise
Published
2025-01-27
DOI
https://doi.org/10.1021/cen-10302-buscon2
Primary Topic
Extraction and Separation Processes
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

US bets on new lithium extraction technology

Matt Blois
C&EN Global Enterprise
Extraction and Separation Processes
article

US bets on new lithium extraction technology

Matt Blois
article en

Abstract

The US Department of Energy (DOE) has committed to a $1.4 billion loan for a project that will use an emerging technology to separate lithium from geothermal brines in California. The agency says the loan, to EnergySource Minerals, is an important step toward establishing a battery supply chain in the US. EnergySource plans to build a direct lithium extraction (DLE) plant in Imperial County, near the Salton Sea. At full capacity, the firm hopes to produce 20,000 metric tons (t) of lithium hydroxide per year, enough for about half a million electric car batteries. EnergySource had hoped to start operating the plant this year but now says trial operations are slated for 2026 and full production is expected by the end of 2027. EnergySource will have to meet certain conditions before closing the loan. EnergySource has secured investments from the oil-field services company SLB and from Livent, a lithium producer

C&EN Global EnterpriseVol. 103(2)
Openalex Percentile: Top 99%
Extraction and Separation Processes
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.