Finding gaps in the national electric vehicle charging station coverage of the United States

The United States federal government has invested $7.5 billion into charging infrastructure, including the National Electric Vehicle Infrastructure Program, to build fast charging stations along designated highways for long-distance car travel. We develop a consecutive coverage metric to compute the percent of United States roads (traffic-weighted) that are consecutively accessible within 500 miles of each county. We answer (1) what the state of consecutive coverage is in each county and (2) what the increase in coverage is when designated highways receive fast chargers. In 2023, 10% of counties had at least 75% minimum viable coverage. We find that if all designated highways receive fast-charging stations, 94% of United States counties will reach at least 75% fast charger coverage. However, the remaining counties are rural. This demonstrates that federal funding for fast chargers will help connect most-but not all-counties to the national network of continuously accessible charging stations.

Authors

Institutions

Publication Details

Journal
Nature Communications
Published
2025-01-27
DOI
https://doi.org/10.1038/s41467-024-55696-8
Citations
23
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
16.80

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Finding gaps in the national electric vehicle charging station coverage of the United States

Corey D. Harper, Lily Hanig, Destenie Nock, Eric Wood et al.
23 citations
Nature Communications
Electric Vehicles and Infrastructure
16.80
article

Finding gaps in the national electric vehicle charging station coverage of the United States

Corey D. Harper, Lily Hanig, Destenie Nock, Eric Wood, Arthur Yip, Catherine Ledna, C. Anna Spurlock
article en
23 citations

Abstract

The United States federal government has invested $7.5 billion into charging infrastructure, including the National Electric Vehicle Infrastructure Program, to build fast charging stations along designated highways for long-distance car travel. We develop a consecutive coverage metric to compute the percent of United States roads (traffic-weighted) that are consecutively accessible within 500 miles of each county. We answer (1) what the state of consecutive coverage is in each county and (2) what the increase in coverage is when designated highways receive fast chargers. In 2023, 10% of counties had at least 75% minimum viable coverage. We find that if all designated highways receive fast-charging stations, 94% of United States counties will reach at least 75% fast charger coverage. However, the remaining counties are rural. This demonstrates that federal funding for fast chargers will help connect most-but not all-counties to the national network of continuously accessible charging stations.

Nature CommunicationsVol. 16(1)
National Laboratory of the Rockies (US), Lawrence Berkeley National Laboratory (US), Carnegie Mellon University (US)
National Science Foundation, U.S. Department of Energy, Alfred P. Sloan Foundation, Office of Energy Efficiency and Renewable Energy, Office of Energy Efficiency, Lawrence Berkeley National Laboratory
Industry, innovation and infrastructure
Openalex Percentile: Top 1%
Electric Vehicles and Infrastructure
16.80
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Finding gaps in the national electric vehicle charging station coverage of the United States — Corey D. Harper, Lily Hanig, et al. · Nature Communications (2025) | TGRS Research Map | TGRS