ANALISIS KESEIMBANGAN LINI PROSES PCB ASSEMBLY RADIO P155 SRS DI PT PANASONIC MANUFACTURING INDONESIA

PT Panasonic Manufacturing Indonesia is one of the largest manufacturing companies producing electronic products in Indonesia, achieving significant growth and development in its production processes. Ensuring an efficient production process requires maintaining proper line balancing to achieve smooth operations. However, the radio P155 Srs production line experienced workload imbalances that led to bottlenecks and time losses. These issues arose due to factors such as insufficiently skilled workers and mismatched workloads that were not aligned with operators' abilities. Such conditions can lead to worker fatigue and reduced motivation and negatively impact work effectiveness. Research conducted using the Ranked Position Weight (RPW) method demonstrated improvements by reducing the number of workstations from 12 to 8. This optimization resulted in increased track efficiency, which improved from 65.10% and 57.43% to 83.10% and 85.94%.

Authors

Publication Details

Journal
Jurnal Teknik dan Science
Published
2024-11-03
DOI
https://doi.org/10.56127/jts.v3i3.1895
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS KESEIMBANGAN LINI PROSES PCB ASSEMBLY RADIO P155 SRS DI PT PANASONIC MANUFACTURING INDONESIA

Arief Nurdini, Ardhy Lazuardy, Citra Amelia Pratiwi
Jurnal Teknik dan Science
Management and Optimization Techniques
article

ANALISIS KESEIMBANGAN LINI PROSES PCB ASSEMBLY RADIO P155 SRS DI PT PANASONIC MANUFACTURING INDONESIA

Arief Nurdini, Ardhy Lazuardy, Citra Amelia Pratiwi
article en

Abstract

PT Panasonic Manufacturing Indonesia is one of the largest manufacturing companies producing electronic products in Indonesia, achieving significant growth and development in its production processes. Ensuring an efficient production process requires maintaining proper line balancing to achieve smooth operations. However, the radio P155 Srs production line experienced workload imbalances that led to bottlenecks and time losses. These issues arose due to factors such as insufficiently skilled workers and mismatched workloads that were not aligned with operators' abilities. Such conditions can lead to worker fatigue and reduced motivation and negatively impact work effectiveness. Research conducted using the Ranked Position Weight (RPW) method demonstrated improvements by reducing the number of workstations from 12 to 8. This optimization resulted in increased track efficiency, which improved from 65.10% and 57.43% to 83.10% and 85.94%.

Jurnal Teknik dan ScienceVol. 3(3)
Openalex Percentile: Top 54%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.