Implementation of Design Thinking UI/UX Construction RAB Application at PT PLN (Persero) UID S2JB Lahat

An efficient and accurate Cost Budget Plan (RAB) plays an important role in the construction industry because it is directly related to project cost management. PT PLN (Persero) UID S2JB UP3 Lahat still uses manual methods to manage RAB, which causes the process of searching for documents and information to be slow and inefficient. To overcome this challenge, a website-based Construction RAB application was designed using the Design Thinking approach, which aims to improve the user interface (UI) and user experience (UX) in the RAB management process. This design process involves five stages of Design Thinking, namely empathize, define, ideate, prototype, and test. Using Figma, a UI/UX design prototype was developed as a visual and functional representation of the new design. The results of this development show a significant increase in the efficiency and effectiveness of RAB management at PT PLN (Persero) UID S2JB UP3 Lahat, including reducing the time needed to search for and access information related to RAB. The implementation of this application is expected to help companies manage RAB more effectively, increase productivity, and minimize errors in recording and managing costs.

Authors

Institutions

Publication Details

Journal
International Journal Software Engineering and Computer Science (IJSECS)
Published
2024-12-01
DOI
https://doi.org/10.35870/ijsecs.v4i3.3120
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementation of Design Thinking UI/UX Construction RAB Application at PT PLN (Persero) UID S2JB Lahat

Wahdyta Putri Panggabean, Megawaty
International Journal Software Engineering and Computer Science (IJSECS)
Management and Optimization Techniques
article

Implementation of Design Thinking UI/UX Construction RAB Application at PT PLN (Persero) UID S2JB Lahat

Wahdyta Putri Panggabean, Megawaty
article en

Abstract

An efficient and accurate Cost Budget Plan (RAB) plays an important role in the construction industry because it is directly related to project cost management. PT PLN (Persero) UID S2JB UP3 Lahat still uses manual methods to manage RAB, which causes the process of searching for documents and information to be slow and inefficient. To overcome this challenge, a website-based Construction RAB application was designed using the Design Thinking approach, which aims to improve the user interface (UI) and user experience (UX) in the RAB management process. This design process involves five stages of Design Thinking, namely empathize, define, ideate, prototype, and test. Using Figma, a UI/UX design prototype was developed as a visual and functional representation of the new design. The results of this development show a significant increase in the efficiency and effectiveness of RAB management at PT PLN (Persero) UID S2JB UP3 Lahat, including reducing the time needed to search for and access information related to RAB. The implementation of this application is expected to help companies manage RAB more effectively, increase productivity, and minimize errors in recording and managing costs.

International Journal Software Engineering and Computer Science (IJSECS)Vol. 4(3)
Universitas Bina Darma (ID)
Openalex Percentile: Top 55%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.